Design review · Planning application

Fiber equipment shelter with backup generator approved for Ziply Fiber

The city approved with conditions a small wood-frame shelter to house Ziply Fiber equipment, cooled by three mini-split units. A fenced backup generator would run the facility during power outages. The site currently holds a residence.

ApprovedDR-00445-2026Filed Aug. 24, 2026South Nampa · 1832 E Sherman Ave
Site plan for Fiber equipment shelter with backup generator approved for Ziply Fiber
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

About this application

The scope of the project includes the construction of a fiber shelter that is designed to house equipment for Ziply Fiber. The equipment is laid out in a single aisle. Three individual three ton mini-split units are provided to handle cooling of the facility. The structure is built on a mono-slab on grade with wood frame construction. Additionally, an emergency backup generator will be installed within the fenced area that will kick on in the event that power is disrupted to the facility.

Project name on file: Ziply Fiber - Nampa

Timeline

  1. Aug. 25, 2026

    11 documents added

  2. Aug. 25, 2026

    Assess Fees (Building & Site)

  3. Aug. 25, 2026

    Decision: Approved with Conditions

  4. Aug. 25, 2026

    Planning Application Review

  5. Aug. 25, 2026

    P&Z Planner Review

  6. Aug. 24, 2026

    Application filed

Documents

Site plans

Other documents

  • DR-00445-2026_Ziply Fiber_DR Decision Letter.pdf

    Aug. 25, 2026 · Available Online

  • A101 - Floor Plan, Roof Plan, Plan and Assemblies .pdf

    Aug. 24, 2026 · Building Finishes

  • A101 PLAN & A201 ELEVATIONS.pdf

    Aug. 24, 2026 · Color Samples

  • A201 - Exterior Elevations.pdf

    Aug. 24, 2026 · Building Elevations

  • Affidavit of Legal Interest.pdf

    Aug. 24, 2026 · Affidavit of Legal Interest

  • Application Packet.pdf

    Aug. 24, 2026 · Checklist & Master Application

  • CIVIL SET.pdf

    Aug. 24, 2026 · Landscaping Plan

  • G001 - Cover Sheet, General Information.pdf

    Aug. 24, 2026 · Vicinity Map

  • Project Narrative.pdf

    Aug. 24, 2026 · Narrative

  • ZIPLY_NAMPA_STAMPED CD SET_08.10.2026.pdf

    Aug. 24, 2026 · Other

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, Meridian, Nampa and Caldwell, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.