Skip to content

Planning project · Planning application

Single-family home with detached accessory unit approved on 1.69-acre hillside lot

City staff approved plans for a single-family home and a detached accessory dwelling unit, two homes in all, on a 1.69-acre lot in the hillside overlay area. The approval was issued Oct. 14 at the administrative level.

ApprovedPLN25-00274Filed March 28, 2025Highlands · 5198 N Becker Ridge Ln+2 related filings
Site plan for Single-family home with detached accessory unit approved on 1.69-acre hillside lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Single family home with detached ADU in Hillside overlay

Project name on file: 5198 N BECKER RIDGE LN

Timeline

  1. Two days ago

    6 documents added

  2. April 8, 2025

    Planning Applications: Generate Additional Application

  3. April 8, 2025

    Pending Application Submittal: Planning Applications in Review

  4. April 3, 2025

    Concept Review Complete: CR Complete - Type 2

  5. April 3, 2025

    Early Assistance Review: Send to Concept Review

  6. April 2, 2025

    Early Assistance Review: Engineering Preview

  7. April 2, 2025

    Early Assistance Review: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report (comment on the discharge of the flow spreaders onto/into the slopes, spa/sauna and retaining walls); structural calculations of any new retaining walls exceeding four feet in height, supporting slopes steeper than a 3H to 1V or having a surcharge; civil plans; and stormwater design calculations for the flow spreaders.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  8. April 2, 2025

    Early Assistance Review: Corrections Required

    Please include the setback information and the measurements for the ADU on the site plan. Note the depth and width of the driveway for the ADU on the site plan.

  9. March 28, 2025

    Application Submittal: Online

  10. March 28, 2025

    Application filed

Documents

Site plans

Other documents

  • PDS-Concept Review Summary Report -

    April 3, 2025 · 454 KB · PDS-Concept Review Summary Report

  • PDS-Application

    March 28, 2025 · 154 KB · PDS-Application

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE

    March 28, 2025 · 678 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - PROJECT DESCRIPTION

    March 28, 2025 · 50 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.