Skip to content

Planning project · Planning application

Subdivision of 43-acre industrial site proposed, decision by City Council

A subdivision is proposed for a 43.63-acre site zoned for light industrial use and currently vacant land. The application, filed April 15, 2025, is in city review, with the City Council set to decide.

In reviewPLN25-00331Filed April 15, 2025South Eisenman · 2392 E Winco Ct+3 related filings
Site plan for Subdivision of 43-acre industrial site proposed, decision by City Council
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Subdivision

Project name on file: 2392 E WINCO CT

Timeline

  1. Two days ago

    4 documents added

  2. Aug. 26, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 25, 2026

    Planning Applications: Generate Additional Application

  4. March 5, 2026

    Pending Application Submittal: Planning Applications in Review

  5. June 25, 2025

    Concept Review Complete: Generate AWS

    Opened CR to generate AWS per M. Trout.

  6. June 24, 2025

    Concept Review Complete: CR Complete - Type 4 NBR-IDR Waived

  7. May 23, 2025

    Concept Review Complete: Corrections Required

    Please include the width of the proposed right-of-way, and the width of the landscape buffers and detached sidewalks on the site plan.

  8. April 23, 2025

    Concept Review Complete: Corrections Required

    • Please upload a dimensioned site plan showing the building footprints and their distance from the property lines.• Please also show sidewalks. Sidewalks must meet current code requirements (5’ detached).• Please show the required turnaround on the north on the site plan as well. Please upload written approval from ACHD.

  9. April 22, 2025

    Concept Review Complete: Notes

    Move WF to Concept Review. EA no longer applies.

  10. April 15, 2025

    Application Submittal: Online

  11. April 15, 2025

    Application filed

Documents

Site plans

  • Site plan showing three logistics buildings with square footage, parking, dock door and trailer space counts, plus building setback dimensions and parcel area.

    May 23, 2025 · 1 page · 1.2 MB · PDS-Other Small Docs

    Download Dimensioned site plan
  • Survey sheet of a subdivision plat with bearings and distances for lot boundaries, prepared by a licensed surveying firm.

    April 15, 2025 · 1 page · 337 KB · PDS-Other Small Docs

    Download Preliminary plat and site plan sheet

Project narrative

Application

  • Application form for an industrial project on an I-1 zoned parcel, stating the property is intended for uses permitted in I-1 districts.

    April 15, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.