Skip to content

Planning project · Planning application

Removal of invasive Russian olive trees from park wetland approved

The Planning & Zoning Commission approved a river system permit on Nov. 18 to clear about 5 acres of Russian olive trees using heavy equipment and hand tools. The area would be replanted with cottonwoods, willows and native shrubs, and existing native trees kept.

ApprovedPLN25-00563Filed July 8, 2025Downtown Boise · 1001 N Americana Blvd+1 related filing
Site plan for Removal of invasive Russian olive trees from park wetland approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

No description has been published for this record yet.

Project name on file: 1001 N AMERICANA BLVD

Timeline

  1. Nov. 18, 2025

    Planning Applications: Project Entitled

  2. Oct. 15, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Sept. 29, 2025

    IDR Review Complete: IDR Waived

  4. Sept. 29, 2025

    Neighborhood Meeting Review: Completed

    held 9-16-25

  5. July 23, 2025

    Concept Review Complete: CR Complete - Type 3

  6. July 14, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category I Hillside project. In addition to the already submitted documents, additional documents may be required during the BLD Review process.No additional documentation is needed at this time.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  7. July 11, 2025

    Concept Review Complete: Engineering Preview

  8. July 8, 2025

    Application Submittal: Online

  9. July 8, 2025

    Application filed

Documents

Site plans

  • Maps showing the project area against floodplain, river system and Class A and B lands and waters, with the location of proposed vegetation removal.

    July 8, 2025 · 4 pages · 1.6 MB · PDS-Other Small Docs

    Download Floodplain, river system and Class A, B lands maps
  • One-page site plan showing the area proposed for vegetation removal, labeled as a removal project area.

    July 8, 2025 · 1 page · 447 KB · PDS-Other Small Docs

    Download Site plan and area of vegetation removal

Project narrative

Notices

  • Boise Parks and Recreation summarizes its Sept. 16 neighborhood meeting for the Russian Olive removal at Kathryn Albertson Park, noting no public attendees and one emailed bird-impact concern.

    Sept. 29, 2025 · 2 pages · 94 KB · PDS-Other Small Docs

    Download Neighborhood meeting summary form
  • Sept. 24, 2025 · 48 KB · PDS-Other Small Docs

    Download 500-foot radius mailing list
  • Postcard inviting the public to a Sept. 16 meeting on the Russian olive removal project at Kathryn Albertson Park, which will clear 5 acres of invasive trees.

    Sept. 24, 2025 · 2 pages · 1.6 MB · PDS-Other Small Docs

    Download Mailed postcard notifications for neighborhood meeting invite
  • Sign-in sheet from the Sept. 16 public open house hosted by Boise Parks & Recreation, with attendee contact and how-they-heard columns; handwriting is largely illegible in the text.

    Sept. 24, 2025 · 1 page · 48 KB · PDS-Other Small Docs

    Download Neighborhood meeting sign-in sheet

Application

  • Application from the City of Boise Parks and Recreation Department for a Park or Playground use in an A-1 zone, stating no change in use is proposed.

    July 8, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire answering no to parcel changes, additions, new dwellings, driveways, deep grading, and retaining walls over 4 feet or stacked within 10 feet.

    July 8, 2025 · 1 page · 692 KB · PDS-Other Small Docs

    Download Hillside project questionnaire, filled out

Correspondence

  • City staff acknowledges a resident's emailed concerns about Russian olive removal and habitat impacts at the park and copies the project team on the response.

    Sept. 24, 2025 · 3 pages · 121 KB · PDS-Other Small Docs

    Download Staff reply to citizen correspondence on Russian olive removal
  • Corps determines the Russian olive removal in the park would not discharge dredged or fill material into regulated waters, so no Department of Army authorization is needed.

    Sept. 24, 2025 · 2 pages · 175 KB · PDS-Other Small Docs

    Download Army Corps of Engineers letter, no Section 404 permit required
  • Letter from Idaho Department of Lands approving a four-month project period extension, scope changes, and a new project principal for the Stack Rock fuels reduction grant.

    July 8, 2025 · 4 pages · 934 KB · PDS-Other Small Docs

    Download Amendment to MOU on fire fuels reduction program funding

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.