Skip to content

Planning project · Planning application

Four-story, 121-room extended-stay hotel approved

The Design Review Commission approved the Hilton-branded LivSmart Studios hotel on about 2.2 acres on Feb. 17. Stays would be limited to 30 days, with 122 surface parking spaces and a building of about 59,000 square feet.

ApprovedPLN25-00685Filed Aug. 13, 2025Southeast Boise · 2149 E Hospitality Ln+4 related filings
Site plan for Four-story, 121-room extended-stay hotel approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Four story, 121 room apartment/hotel

Project name on file: 2149 E HOSPITALITY LN

Timeline

  1. Feb. 17, 2026

    Planning Applications: Project Entitled

  2. Dec. 22, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Nov. 13, 2025

    Public hearing: Hybrid

  4. Nov. 13, 2025

    IDR Review Complete: IDR Complete

  5. Nov. 7, 2025

    Neighborhood Meeting Review: Completed

  6. Aug. 28, 2025

    Concept Review Complete: CR Complete - Type 3

  7. Aug. 20, 2025

    Concept Review Complete: Corrections Required

    Please clarify the length of stay in this project.Please update site plan to show it meets MX-2 dimensional requirements (no parking in front of building).

  8. Aug. 13, 2025

    Application Submittal: Online

  9. Aug. 13, 2025

    Application filed

Documents

Site plans

  • Revised site plan for the LiveSmart Boise hotel test fit, showing all parking removed from the front of the building, with site and zoning data for the Boise MX-2 zone.

    Aug. 25, 2025 · 4 pages · 3.6 MB · PDS-Other Small Docs

    Download Revised site plan removing front parking
  • Conceptual site plan for a proposed hotel, showing a 121-room prototype, easements, a private street, and a note that no landscape separation buffer is required next to the I-1 zone.

    Aug. 13, 2025 · 1 page · 911 KB · PDS-Other Small Docs

    Download Site plan layout

Project narrative

Other documents

  • PDS-Interdepartmental Review Summary Report - 11/13/2025

    Nov. 17, 2025 · 696 KB · PDS-Interdepartmental Review Summary Report

  • PDS-Other Small Docs - ADDITIONAL IDR PLANS_11/13/2025

    Nov. 12, 2025 · 2.7 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - NEIGHBORHOOD MEETING SIGN IN AND SUMMARY

    Nov. 7, 2025 · 3.5 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - IDR PLANS_11/13/2025

    Oct. 30, 2025 · 6.2 MB · PDS-Other Small Docs

  • PDS-Concept Review Summary Report -

    Aug. 28, 2025 · 462 KB · PDS-Concept Review Summary Report

  • PDS-Other Small Docs - SIGN PROGRAM CSN98-00151

    Aug. 28, 2025 · 1.5 MB · PDS-Other Small Docs

  • PDS-Application

    Aug. 13, 2025 · 154 KB · PDS-Application

  • PDS-Other Small Docs - DESCRIPTION OF PROJECT SCOPE AND SCALE.

    Aug. 13, 2025 · 84 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - ZONING AND PARKING SUMMARY

    Aug. 13, 2025 · 1.5 MB · PDS-Other Small Docs

Nearby

Conditional use · Planning application

Conditional use permit approved

ApprovedDecided March 13, 2024CUP23-00076South Eisenman · 6850 S Eisenman Rd0.2 mi away

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.