Planning project · Planning application
Bridge over Five Mile Creek to be extended 12 feet for wider road, approved
Adler Industrial's plan extends the existing bridge by about 12 feet, 8 feet on the north side and 4 feet on the south, to fit road widening required for traffic intersection improvements. The city approved it on Aug. 18; a floodplain permit is still needed.

About this application
Adler Industrial plans to widen Gowen Road near Orchard Street as part of required traffic intersection improvements. To fit the wider road, the existing bridge over Five Mile Creek would be extended by about 12 feet, 8 feet to the north and 4 feet to the south. The city is reviewing a floodplain permit for the work; this is an early concept review, not a decision.
CFH
Project name on file: 5121 W GOWEN RD CFH
Timeline
Two days ago
4 documents added
Aug. 18, 2026
Planning Applications: Project Entitled
Feb. 13, 2026
Pending Application Submittal: Planning Applications in Review
Dec. 8, 2025
Concept Review Complete: CR Complete - Type 2
Dec. 4, 2025
Application Submittal: Online
Dec. 4, 2025
Application filed
Documents
Site plans
- Download Site plan sheet with grading and utility layout
Engineering sheet with stationing, grading, drainage and utility annotations along a roadway; text is largely garbled and the sheet is not fully legible.
Dec. 4, 2025 · 1 page · 2.1 MB · PDS-Other Small Docs
Project narrative
- Download Project description for creek bridge extension and floodplain permit
Describes extending an existing creek bridge about 12 feet to support road widening, and requests a project number to file a floodplain development permit.
Dec. 4, 2025 · 1 page · 55 KB · PDS-Other Small Docs
Staff reports
- Download PDS-Concept Review Summary Report -
Dec. 8, 2025 · 1 page · 451 KB · PDS-Concept Review Summary Report
Application
- Download PDS-Application
Dec. 4, 2025 · 2 pages · 158 KB · PDS-Application