Skip to content

Planning project · Planning application

Remodel of single-family house with regrading and daylight basement approved

City staff approved plans to regrade the front of a 1.19-acre lot, add a daylight basement with patio, convert a carport to a garage and add living space and a deck. Two trees would be removed. The decision came Sept. 25.

ApprovedPLN25-01121Filed Dec. 19, 20256750 W Hill Rd+1 related filing
Site plan for Remodel of single-family house with regrading and daylight basement approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

New grading and exterior remodeling of a single-family dwelling in the Hillside overlay.

Project name on file: 6750 W HILL RD

Timeline

  1. Two days ago

    9 documents added

  2. Sept. 25, 2026

    Planning Applications: Project Entitled

  3. April 28, 2026

    Pending Application Submittal: Planning Applications in Review

  4. Dec. 29, 2025

    Concept Review Complete: CR Complete - Type 2

  5. Dec. 23, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical (these requirements will be assessed again at the time of occupancy); and civil plans.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  6. Dec. 19, 2025

    Concept Review Complete: Engineering Preview

  7. Dec. 19, 2025

    Application Submittal: Online

  8. Dec. 19, 2025

    Application filed

Documents

Site plans

  • Single-page sketch of the existing site with an aerial view, noting planned regrading for a daylight basement, converting a covered patio and carport into living space and a garage, and removing two pine trees.

    Dec. 19, 2025 · 1 page · 243 KB · PDS-Other Small Docs

    Download Existing site plan and aerial view

Plans

  • Schematic floor plan for the lower level of a residence remodel, showing demolished and retained walls, new windows, a patio, a retaining wall, and a carport converted to a garage.

    Dec. 19, 2025 · 1 page · 130 KB · PDS-Other Small Docs

    Download Proposed lower floor plan
  • Schematic design floor plan of the proposed upper floor, showing a new primary suite, dining area, entry deck stair and composite deck with slider, marked preliminary and not for construction.

    Dec. 19, 2025 · 1 page · 186 KB · PDS-Other Small Docs

    Download Proposed second floor plan

Project narrative

  • Describes planned work including re-grading for a daylight basement and patio, converting the carport to a garage, a new upstairs deck and living space, and remodeled interior.

    Dec. 19, 2025 · 1 page · 30 KB · PDS-Other Small Docs

    Download Project description narrative

Application

  • Application for a residential remodel at an A-1 zoned property, converting a covered patio to living space and carport to garage, with grade changes for a new patio and deck.

    Dec. 19, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Other documents

  • PDS-Concept Review Summary Report -

    Dec. 29, 2025 · 452 KB · PDS-Concept Review Summary Report

  • PDS-Agency Comments - HILLSIDE RETAINING WALL PERMITTING_OCTOBER2025

    Dec. 23, 2025 · 804 KB · PDS-Agency Comments

  • PDS-Other Small Docs - HILLSIDE FORM

    Dec. 19, 2025 · 676 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - TOPOGRAPHY SURVEY

    Dec. 19, 2025 · 300 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.