Skip to content

Planning project · Planning application

New 1,350-square-foot PFAS treatment building proposed at existing well site

The plan keeps the existing wellhouse and adds a treatment facility to its east, plus a new service drive, added driveways and a 6-foot security fence. Some trees would be removed. It is under administrative review.

SubmittedPLN26-00740Filed Aug. 5, 2026West Bench · 8562 W Fircrest Dr+1 related filing
Site plan for New 1,350-square-foot PFAS treatment building proposed at existing well site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Updates to existing minor utility facility

Project name on file: 8562 W FIRCREST DR

Timeline

  1. Two days ago

    10 documents added

  2. Sept. 2, 2026

    Concept Review Complete: CR Complete - Type 2

  3. Aug. 14, 2026

    Concept Review Complete: Corrections Required

    Please dimension the site plan to show the distance from the property line to the proposed fence. If the proposed fence is outside of the 20' setback, then no variance is required. If the fence can meet code requirements, it may be difficult to support the fence variance.

  4. Aug. 13, 2026

    Concept Review Complete: Engineering Preview

  5. Aug. 13, 2026

    Concept Review Complete: Corrections Required

    Please provide a project description for this location. the one uploaded is for the Riviera property.

  6. Aug. 13, 2026

    Concept Review Complete: Engineering Preview Complete

    The variance requested is accepted and will be addressed via email; it is anticipated to approved based on similar projects with Veolia. Please submit any approvals during building application requests to verify approval.

  7. Aug. 5, 2026

    Application Submittal: Online

  8. Aug. 5, 2026

    Application filed

Documents

Plans

Project narrative

Application

Other documents

  • PDS-Other Small Docs - UPDATED TO CORRECT SITE, PLEASE DISREGARD THE OTHER COPY: DESCRIPTION OF THE PROPOSED VEOLIA - GODDARD WELL PFAS TREATMENT PROJECT.

    Aug. 13, 2026 · 265 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - ATTACHMENT C - SERVICE DRIVE REQUEST FOR THE PROPOSED VEOLIA - GODDARD WELL PFAS TREATMENT PROJECT.

    Aug. 5, 2026 · 3.8 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - ATTACHMENT D - FENCING HEIGHT REQUEST FOR THE PROPOSED VEOLIA - GODDARD WELL PFAS TREATMENT PROJECT.

    Aug. 5, 2026 · 3.2 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - ATTACHMENT E - INFILTRATION SETBACK VARIANCE REQUEST FOR THE PROPOSED VEOLIA - GODDARD WELL PFAS TREATMENT PROJECT.

    Aug. 5, 2026 · 2.7 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - DESCRIPTION OF THE PROPOSED VEOLIA - GODDARD WELL PFAS TREATMENT PROJECT.

    Aug. 5, 2026 · 267 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.