Skip to content

Planning project · Planning application

Concept plan for development on vacant land under city review

A concept review application was filed Oct. 7 for a site now listed as vacant land. The file includes a site plan with grading, and the city has sent back corrections. The application does not say what would be built.

In reviewPLN26-00927Filed Oct. 7, 2026Highlands · 3597 N Scenic Ridge Ln
Site plan for Concept plan for development on vacant land under city review
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

No description has been published for this record yet.

Project name on file: 3597 N SCENIC RIDGE LN

Timeline

  1. Yesterday

    Status changed from “Engineering Preview” to “Concept Review Corrections”

  2. Yesterday

    Concept Review Complete: Corrections Required

    In review of the final plat and the CC&R's for Leoni Hills Subdivision No 2, the following information will need to be discussed prior to an engineering determination for the PLN.Excerpt from the CCR's:Section 3.22 No Water Zone: No Lot or Common Area shall use or allow the use of any irrigation or water in the No Water Zone on the Property. Further, no Lot or Common Area shall permit any modification of the graded slope or any work or activity that would disrupt or cause drainage water runoff to flow to the west from the No Water Zone on the Property. The Association shall enforce the provisions and limitations of the No Water Zone and shall specifically approve any work or activity in the No Water Zone. Section 1.8 and this section 3.22 of the Declaration shall not be amended without approval of the City of Boise.Per Melissa Jannusch email of 13 October 2026: I think the best bet would be to schedule a pre-application style meeting through the planning department so we can get our team, planning, and possibly fire along with your development team (civil, geotech, LA) all at the same time.

  3. Two days ago

    5 documents added

  4. Oct. 9, 2026

    Concept Review Complete: Engineering Preview

  5. Oct. 7, 2026

    Application Submittal: Online

  6. Oct. 7, 2026

    Application filed

Documents

Site plans

  • Architectural site plan for a proposed house showing grading, the garage, a covered deck and patio, and finished floor elevations, drawn at 1 inch equals 10 feet.

    Oct. 7, 2026 · 1 page · 293 KB · PDS-Other Small Docs

    Download Site plan with grading

Plans

Other documents

  • PDS-Application

    Oct. 7, 2026 · 154 KB · PDS-Application

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE.

    Oct. 7, 2026 · 672 KB · PDS-Other Small Docs

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.