Skip to content

Subdivision · Planning application

Four-lot commercial subdivision on 5.6 acres approved with conditions

Eagle City Council approved the plat on April 28. No homes are allowed, and lots must be reached from West McLeod Way, not the highway. That road must be built before the first certificate of occupancy. Buildings need separate design review.

ApprovedPP-2025-10Eagle
Pin at the reported location.

About this application

Avimor Development, LLC wants to split a 5.63-acre site on the east side of Highway 55 in Boise County, about 500 feet north of Crowfoot Way, into four commercial lots. No homes are proposed. The lots would get access from the future West McLeod Way, with construction planned to begin in late 2026.

Avimor Development, LLC, represented by Brad Pfannmuller, is requesting preliminary plat approval for HSC Subdivision, a 4-lot commercial subdivision. Avimor HSC Subdivision is a re-subdivision of Lot 2, Block 1, of the Avimor Boise County Phase 1 Subdivision. The 5.63-acre site is generally located within Boise County on the east side of State Highway 55, approximately 500-feet north of the intersection of State Highway 55 and Crowfoot Way.

Project name on file: Avimor HSC Subdivision

Timeline

  1. May 4, 2026

    Eagle Planning and Zoning Commission recommended approval

  2. April 28, 2026

    Approved

    Eagle City Council: Approved. Findings adopted May 12, 2026.

  3. April 28, 2026

    Public hearing: Eagle City Council

  4. March 2, 2026

    Public hearing: Eagle Planning and Zoning Commission

Documents

Staff reports

  • City of Eagle staff report on a 4-lot commercial re-subdivision of a 5.63-acre site, covering the project summary, vicinity and preliminary plat exhibits, and the Council hearing memo.

    April 27, 2026 · 50 pages · 11.9 MB · Staff Report

    Download Staff report for Avimor HSC Subdivision preliminary plat
  • City of Eagle staff report recommending site-specific and standard conditions of approval for a 4-lot commercial re-subdivision, with a March 2, 2026 hearing date.

    March 1, 2026 · 49 pages · 11.8 MB · Staff Report

    Download Staff report for preliminary plat

Decisions

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, Meridian, Nampa, Caldwell and Eagle, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.