Skip to content

Planned unit development · Planning application

Changes to 2,199-home master plan on 1,006 acres head to Planning and Zoning Commission

Clyde Capital Group wants to revise land uses, densities, roads and open space on two large lots in the Valnova planning unit. The plan cuts 17 buildable lots but keeps 2,199 homes. The commission holds a hearing Oct. 19.

Hearing scheduledPU-2021-01-MOD1Eagle
Pin at the reported location.

About this application

Clyde Capital Group wants to change the approved Valnova (Spring Valley) master plan for Planning Unit No. 1 in the Eagle foothills. The changes affect land use designations, housing densities, road layouts, and open space on two large lots in the southwestern part of the 1,005.91-acre planning unit. The applicant proposes a net reduction of 17 buildable lots in the affected area while keeping the overall total of 2,199 homes for the planning unit.

Clyde Capital Group, LLC, represented by Eric Langvardt with Langvardt Design Group, is requesting Planning Unit Master Plan (PUMP) No. 1 modification approval. The proposed modifications include amendments to the land use designations and residential densities, roadway configurations, open space adjacency, and allocated open spaces within Lot 6 and Lot 8, Block 1, of the Spring Valley Subdivision No. 1 large lot plat. The 1,005.91-acre site is generally located 3,000-feet northeast of the intersection of State Highway 16 and Equest Lane, approximately 1.00-mile north of the Beacon Light Road and Linder Road intersection.

Timeline

  1. Oct. 19, 2026

    Document added: Valnova Subdivision - Staff Packet

  2. Oct. 19, 2026

    Public hearing: Eagle Planning and Zoning Commission

Documents

Staff reports

  • City of Eagle staff report recommending action on a modification to the Spring Valley (Valnova) Planning Unit Master Plan No. 1, covering land use, density, roadway and open space changes, for an Oct. 19 commission…

    Oct. 18, 2026 · 63 pages · 21.8 MB · Staff Report

    Download Staff report on Valnova planning unit master plan modification

The Boise Builds daily briefing

Every new planning application in Boise, Meridian, Nampa, Caldwell and Eagle, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.