Skip to content

Record of survey · Planning application

Plan to split 0.2-acre lot into two returned to applicant

The owner wants to divide a lot with one existing home to create a second buildable lot. No construction is planned now, though a single-family home could come later. The city returned the application, which is on hold.

On holdROS25-00005Filed March 7, 2025Vista · 1853 W Malad Ln+1 related filing
Site plan for Plan to split 0.2-acre lot into two returned to applicant
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Minor Land Division

Project name on file: 1853 W MALAD LN

Timeline

  1. Jan. 20, 2026

    Review Complete: Corrections Required

  2. Jan. 20, 2026

    Current Planning: Corrections Required

  3. Dec. 23, 2025

    Current Planning: In Review

  4. Dec. 23, 2025

    Assign Reviewers: Completed

  5. Dec. 17, 2025

    Review Complete: Corrections Required

  6. Dec. 17, 2025

    Current Planning: Corrections Required

  7. Dec. 16, 2025

    Building Plan Reviewer: Complete

  8. Dec. 11, 2025

    Building Plan Reviewer: In Review

  9. Dec. 11, 2025

    Current Planning: In Review

  10. Dec. 11, 2025

    Assign Reviewers: Completed

  11. Dec. 4, 2025

    Fee Payment: Fee Waived

  12. Dec. 4, 2025

    Fee Payment: Payment Received

    Updated Via Script, status API:WTUA

  13. Oct. 22, 2025

    Prescreen Review: Passed

  14. Oct. 17, 2025

    Prescreen Review: In Progress

  15. Oct. 17, 2025

    Prescreen Review: Corrections Required

  16. Oct. 14, 2025

    Prescreen Review: In Progress

  17. Sept. 19, 2025

    Prescreen Review: Corrections Required

  18. Sept. 18, 2025

    Prescreen Review: In Progress

  19. March 24, 2025

    Prescreen Review: Corrections Required

  20. March 24, 2025

    Prescreen Review: In Progress

  21. March 7, 2025

    Application Submittal: ePlanReview

  22. March 7, 2025

    Application filed

Documents

Site plans

  • Survey site plan showing existing features, a new parcel line, and notes that existing landscaping remains and irrigation district facilities are not present in the area.

    Dec. 15, 2025 · 1 page · 289 KB · PDS-Maps and Drawings

    Download Site plan for property line adjustment
  • Survey plat certifying a property line adjustment and lot consolidation between two parcels, with owner agreement, planning director approval block, and monument notes.

    Dec. 15, 2025 · 1 page · 140 KB · PDS-Record of Survey

    Download Record of survey for property line adjustment

Plans

Project narrative

  • Property owner states no construction is planned on the new lot, outlines possible future uses, and describes utility and irrigation access for the parcel.

    Dec. 15, 2025 · 1 page · 25 KB · PDS-Letter of Intent

    Download Letter of intent for lot split

Application

Correspondence

  • Addressing technician notes Parcel A keeps its address and Parcel B receives a new one, and asks to be notified once the survey is finalized.

    Dec. 23, 2025 · 1 page · 120 KB · PDS-Agency Comments

    Download Addressing agency comments on record of survey
  • The Building Department reviewed the preliminary record of survey and has no comments, but notes a new accessory structure will need a separate building permit.

    Dec. 23, 2025 · 1 page · 114 KB · PDS-Agency Comments

    Download Building Department agency comments
  • Fire Department letter approving the record of survey subject to code conditions on hydrant spacing, fire apparatus access, turning radius and street parking restrictions.

    Dec. 23, 2025 · 2 pages · 523 KB · PDS-Agency Comments

    Download Boise Fire Department agency comments
  • Boise Parks and Recreation notes that the parcel adjustment would create a buildable lot where at least three mature trees would likely need removal for future construction.

    Dec. 23, 2025 · 1 page · 58 KB · PDS-Agency Comments

    Download Parks and Recreation agency comments
  • Public Works requires a separate sewer service connection for each parcel, with tap design drawings submitted before the survey is signed, and protection of historic drainage and irrigation facilities.

    Dec. 23, 2025 · 1 page · 64 KB · PDS-Agency Comments

    Download Public Works sewer and irrigation comments
  • Internal city emails from April 2023 about a refund on a withdrawn Record of Survey application and whether a related address fee can be voided or removed.

    Dec. 15, 2025 · 4 pages · 228 KB · PDS-Correspondence

    Download Staff emails on removing an address fee after refund
  • City of Boise letter confirming sanitary sewer service is available to the property via an existing 8-inch main, subject to code compliance and possible capacity fees.

    Dec. 15, 2025 · 1 page · 88 KB · PDS-Other Small Docs

    Download Sanitary sewer will-serve letter
  • Veolia states the proposed project is serviceable under its current tariffs, with new services and fire hydrants required, and the letter expires after twelve months.

    Dec. 15, 2025 · 1 page · 311 KB · PDS-Other Small Docs

    Download Veolia water serviceability letter

Other documents

  • Agency transmittal

    Dec. 17, 2025 · 99 KB · PDS-Transmittal Agencies

  • Warranty deed

    Dec. 15, 2025 · 106 KB · PDS-Deeds

  • Parcel A legal description

    Dec. 15, 2025 · 84 KB · PDS-Other Small Docs

  • Parcel B legal description

    Legal description of Parcel B, included with the record of survey application.

    Dec. 15, 2025 · 88 KB · PDS-Other Small Docs

  • Statement of legal interest

    Dec. 15, 2025 · 12.5 MB · PDS-Statement of Legal Interest

  • Submittal checklist

    Dec. 15, 2025 · 436 KB · PDS-Submittal Checklist

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.