Skip to content

Foothills/hillside · Planning application

47-unit housing project approved

BHV, LLC proposes a subdivision of 47 detached single-family homes on 8.65 acres at 3555 E. Warm Springs Avenue in Boise's Barber Valley.

ApprovedCFH25-00011Filed July 2, 2025Barber Valley · 3573 E Provision Ln+1 related filing
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

BHV, LLC proposes a subdivision of 47 detached single-family homes on 8.65 acres at 3555 E. Warm Springs Avenue in Boise's Barber Valley. The site would be rezoned from open land to medium-density residential, with density capped at about 5.4 homes per acre and homes limited to two stories. About 2.8 acres (32%) would stay as open space, including an enhanced wetland and a 50-foot wildlife corridor.

Retaining Wall in Hillside

Project name on file: 3573 E PROVISION LN

Timeline

  1. Sept. 22, 2026

    Appeal Period: Completed

  2. Sept. 11, 2026

    Review Complete: Completed

  3. Sept. 11, 2026

    Current Planning: Complete

  4. July 22, 2026

    Current Planning: In Review

  5. July 22, 2026

    Assign Reviewers: Completed

  6. April 28, 2026

    Review Complete: Corrections Required

  7. April 28, 2026

    Current Planning: Corrections Required

  8. Jan. 23, 2026

    Current Planning: In Review

  9. Jan. 23, 2026

    Assign Reviewers: Completed

  10. Sept. 8, 2025

    Review Complete: Corrections Required

  11. Aug. 21, 2025

    Current Planning: Corrections Required

  12. July 30, 2025

    Current Planning: In Review

  13. July 30, 2025

    Assign Reviewers: Completed

  14. July 25, 2025

    Fee Payment: Payment Received

  15. July 25, 2025

    Prescreen Review: Passed

  16. July 24, 2025

    Prescreen Review: In Progress

  17. July 24, 2025

    Prescreen Review: Corrections Required

  18. July 22, 2025

    Prescreen Review: In Progress

  19. July 22, 2025

    Prescreen Review: Corrections Required

  20. July 19, 2025

    Prescreen Review: In Progress

  21. July 2, 2025

    Application Submittal: ePlanReview

    Updated Missing Fields per 07.02.2025 Audit. EPlanReview Generating.

  22. July 2, 2025

    Application filed

Documents

Staff reports

Other documents

  • PDS-Maps and Drawings - DRAINAGE IMPROVEMENT PLAN 7/22/2026

    Sept. 21, 2026 · 736 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - PRELIMINARY GRADING PLAN 1/23/2026

    Sept. 21, 2026 · 452 KB · PDS-Maps and Drawings

  • PDS-Other Small Docs - APPROVED BOULDER RETAINING WALL ENGINEERING 1/23/2026

    Sept. 21, 2026 · 286 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - BOULDER RETAINING WALL ENGINEERING ACCEPTANCE LETTER 1/23/2026

    Sept. 21, 2026 · 96 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - ENGINEERING ACCEPTANCE 7/22/2026

    Sept. 21, 2026 · 97 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - EXISTING DRAINAGE FACILITIES MEMO 7/22/2026

    Sept. 21, 2026 · 3.6 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - GETOECH LETTER 1/23/2026

    Sept. 21, 2026 · 973 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - NOTES AND DETAILS 1/23/2026

    Sept. 21, 2026 · 2.3 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - RETAINING WALL CALCULATIONS 7/22/2026

    Sept. 21, 2026 · 250 KB · PDS-Other Small Docs

  • PDS-Action Letter - ADMIN APPROVAL LETTER ISSUED 9/11/2026

    Sept. 11, 2026 · 201 KB · PDS-Action Letter

  • PDS-Legal Notice - ADMIN NOTICE

    Sept. 9, 2026 · 864 KB · PDS-Legal Notice

  • PDS-Maps and Drawings - NOTICING RADIUS MAP

    Sept. 9, 2026 · 602 KB · PDS-Maps and Drawings

  • PDS-Agency Comments - DRAINAGE HILLSIDE AGENCY COMMENTS 8/28/2026

    Sept. 8, 2026 · 129 KB · PDS-Agency Comments

  • PDS-Agency Comments - PARKS AND RECREATION AGENCY COMMENTS 8/4/2026

    Sept. 8, 2026 · 60 KB · PDS-Agency Comments

  • PDS-Letter of Intent - LETTER OF INTENT 7/25/2025

    Aug. 1, 2025 · 208 KB · PDS-Letter of Intent

  • PDS-Maps and Drawings - COVER PAGE 7/25/2025

    Aug. 1, 2025 · 1.1 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - DRAINAGE DETAILS 7/25/2025

    Aug. 1, 2025 · 514 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - DRAINAGE IMPROVEMENT PLANS 7/25/2025

    Aug. 1, 2025 · 2.9 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - ESC PLAN 7/25/2025

    Aug. 1, 2025 · 1.0 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - GRADING & DRAINAGE PLAN 7/25/2025

    Aug. 1, 2025 · 1.4 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - STORM DRAINAGE REPORT 7/25/2025

    Aug. 1, 2025 · 10.5 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - STORM DRAIN PLAN & PROFILE 7/25/2025

    Aug. 1, 2025 · 666 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - STREETS PROFILE 7/25/2025

    Aug. 1, 2025 · 3.1 MB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - TYPICAL SECTIONS 7/25/2025

    Aug. 1, 2025 · 418 KB · PDS-Maps and Drawings

  • PDS-Other Small Docs - DRAINAGE SYSTEM OPERATION & MAINTENANCE PLAN 7/25/2025

    Aug. 1, 2025 · 5.5 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - GEOTECH REPORT 7/25/2025

    Aug. 1, 2025 · 193 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE 7/25/2025

    Aug. 1, 2025 · 693 KB · PDS-Other Small Docs

  • PDS-Photos - SITE PHOTOS 7/25/2025

    Aug. 1, 2025 · 694 KB · PDS-Photos

  • PDS-Statement of Legal Interest - STATEMENT OF LEGAL INTEREST 7/25/2025

    Aug. 1, 2025 · 53 KB · PDS-Statement of Legal Interest

  • PDS-Transmittal Agencies - CFH25-00011 TRANSMITTAL AGENCIES 8-1-25

    Aug. 1, 2025 · 99 KB · PDS-Transmittal Agencies

  • PDS-Receipts -

    July 25, 2025 · 131 KB · PDS-Receipts

  • PDS-Application

    July 2, 2025 · 197 KB · PDS-Application

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.