Design review · Planning application

Engineered tent structure about 40 feet tall approved for industrial storage yard

The city approved one engineered tent structure on a 9.4-acre site now used for laydown and storage. It needs building permits, an erosion control permit and written clearance from Idaho Power. No new landscaping, grading or utilities are planned.

ApprovedDRH26-00231Filed July 8, 2026Southeast Boise · 1780 E Yamhill Rd+1 related filing
Site plan for Engineered tent structure about 40 feet tall approved for industrial storage yard
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

The city approved a request to build one engineered tent structure at 1780 E Yamhill Rd in Boise, on a site now used as a laydown and storage yard. The tent would stand about 40 feet tall at its peak, under the 55-foot limit for the industrial zone. No new landscaping, grading or utilities are proposed.

Engineered Tent Structure in I-2

Project name on file: 1780 E Yamhill Rd

Timeline

  1. Aug. 25, 2026

    Appeal Period: Completed

  2. Aug. 12, 2026

    Review Complete: Completed

  3. Aug. 12, 2026

    DR: Complete

  4. July 22, 2026

    DR: In Review

  5. July 22, 2026

    Assign Reviewers: Completed

  6. July 19, 2026

    Fee Payment: Payment Received

  7. July 13, 2026

    Prescreen Review: Passed

  8. July 10, 2026

    Prescreen Review: In Progress

  9. July 8, 2026

    Application Submittal: ePlanReview

  10. July 8, 2026

    Application filed

Documents

Site plans

Decisions

Other documents

  • PDS-Agency Comments - AIRPORT COMMENTS

    Aug. 12, 2026 · 177 KB · PDS-Agency Comments

  • PDS-Agency Comments - BUILDING COMMENTS

    Aug. 12, 2026 · 59 KB · PDS-Agency Comments

  • PDS-Agency Comments - SEWER COMMENTS

    Aug. 12, 2026 · 64 KB · PDS-Agency Comments

  • PDS-Agency Comments - SOLID WASTE COMMENTS

    Aug. 12, 2026 · 69 KB · PDS-Agency Comments

  • PDS-Legal Notice - ADMIN NOTICE

    Aug. 12, 2026 · 810 KB · PDS-Legal Notice

  • PDS-Maps and Drawings - NOTICING RADIUS MAP

    Aug. 12, 2026 · 543 KB · PDS-Maps and Drawings

  • PDS-Transmittal Agencies - TRANSMITTAL SHEET

    Aug. 6, 2026 · 137 KB · PDS-Transmittal Agencies

  • PDS-Letter of Intent - 8/5/26

    Aug. 5, 2026 · 152 KB · PDS-Letter of Intent

  • PDS-Maps and Drawings - TENT STRUCTURE DRAWINGS

    Aug. 5, 2026 · 3.2 MB · PDS-Maps and Drawings

  • PDS-Other Small Docs - FIRE FLOW

    Aug. 5, 2026 · 110 KB · PDS-Other Small Docs

  • PDS-Photos - SITE CONTEXT PHOTOS

    Aug. 5, 2026 · 3.5 MB · PDS-Photos

  • PDS-Statement of Legal Interest - 8/5/26

    Aug. 5, 2026 · 125 KB · PDS-Statement of Legal Interest

  • PDS-Receipts -

    July 19, 2026 · 131 KB · PDS-Receipts

  • PDS-Application

    July 8, 2026 · 229 KB · PDS-Application