Skip to content

Planning project · Planning application

8,500-square-foot engineered tent structure approved at contractor's shop and yard

The city approved a design review on Aug. 14 for one 85-by-100-foot tent structure. It would sit on an existing concrete slab at a construction company's shop and yard on a 9.4-acre industrial site.

ApprovedPLN26-00602Filed June 22, 2026Southeast Boise · 1780 E Yamhill Rd+1 related filing
Site plan for 8,500-square-foot engineered tent structure approved at contractor's shop and yard
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Engineered Tent Structure in I-2

Project name on file: 1780 E Yamhill Rd

Timeline

  1. Aug. 14, 2026

    Planning Applications: Project Entitled

  2. July 8, 2026

    Pending Application Submittal: Planning Applications in Review

  3. June 30, 2026

    Concept Review Complete: CR Complete - Type 2

  4. June 22, 2026

    Application Submittal: Online

  5. June 22, 2026

    Application filed

Documents

Site plans

  • Architectural site plan from Pivot North Architecture showing the yamhill tent structure, existing structures to remain, setbacks, and property lines, drawn at 1 inch equals 60 feet.

    June 22, 2026 · 1 page · 136 KB · PDS-Other Small Docs

    Download Architectural site plan with tent structure and property lines

Plans

  • Structural drawings and design notes for a clearspan structure, covering wind and snow loads, steel and foundation specifications, and concrete block walls.

    June 22, 2026 · 22 pages · 3.2 MB · PDS-Other Small Docs

    Download Engineered tent drawings

Project narrative

  • Design review cover letter requesting approval for one 85 by 100 foot engineered tent structure, 8,500 square feet, on an existing concrete slab in an industrial shop and yard.

    June 22, 2026 · 1 page · 152 KB · PDS-Other Small Docs

    Download Project description letter

Application

Other documents

  • PDS-Concept Review Summary Report -

    June 30, 2026 · 460 KB · PDS-Concept Review Summary Report

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.