Skip to content

Design review · Planning application

Parking lot replacement sought for Lost River Tavern site

The plan would replace a cracked, failing asphalt lot on about 0.29 acres, rebuilding it like for like to match the existing layout and a previously approved plan. City staff are reviewing the design application.

In reviewDRH26-00295Filed Sept. 9, 2026Morris Hill · 110 N Orchard St+1 related filing
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Parking Lot replacement.

Project name on file: 110 N ORCHARD ST

Timeline

  1. Yesterday

    14 documents added

  2. Oct. 8, 2026

    DR: In Review

  3. Oct. 8, 2026

    Assign Reviewers: Completed

  4. Sept. 30, 2026

    Review Complete: Corrections Required

  5. Sept. 30, 2026

    DR: Corrections Required

  6. Sept. 21, 2026

    DR: In Review

  7. Sept. 21, 2026

    Assign Reviewers: Completed

  8. Sept. 15, 2026

    Fee Payment: Payment Received

  9. Sept. 15, 2026

    Prescreen Review: Passed

  10. Sept. 15, 2026

    Prescreen Review: In Progress

  11. Sept. 10, 2026

    Prescreen Review: Corrections Required

  12. Sept. 10, 2026

    Prescreen Review: In Progress

  13. Sept. 9, 2026

    Prescreen Review: Corrections Required

  14. Sept. 9, 2026

    Prescreen Review: In Progress

  15. Sept. 9, 2026

    Application Submittal: ePlanReview

  16. Sept. 9, 2026

    Application filed

Documents

Project narrative

  • Narrative explaining the replacement of the existing parking lot, which has cracking, water ponding and asphalt failure, with like-for-like materials matching the prior approved plan.

    Sept. 21, 2026 · 1 page · 100 KB · PDS-Letter of Intent

    Download Project narrative for parking lot replacement

Other documents

  • PDS-Transmittal Agencies - DRH26-00295 TRANSMITTAL AGENCIES 10-13-26

    Two days ago · 133 KB · PDS-Transmittal Agencies

  • PDS-Maps and Drawings - COVER SHEET AND GENERAL INFORMATION 9-15-26.

    Sept. 21, 2026 · 385 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - DEMO PLAN 9-15-26

    Sept. 21, 2026 · 190 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - FLOOR PLAN 9-15-26

    Sept. 21, 2026 · 452 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - IMPROVEMENT PLAN 9-15-26

    Sept. 21, 2026 · 554 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - NOTES & LEGEND 9-15-26

    Sept. 21, 2026 · 395 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - TITLE SHEET 9-15-26

    Sept. 21, 2026 · 974 KB · PDS-Maps and Drawings

  • PDS-Other Small Docs - AMENDMENT TO CO 9-15-26

    Sept. 21, 2026 · 2.2 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - VEOLIA FIRE FLOW INFORMATION 9-15-26

    Sept. 21, 2026 · 131 KB · PDS-Other Small Docs

  • PDS-Photos - SITE PHOTOS 9-15-26

    Sept. 21, 2026 · 2.0 MB · PDS-Photos

  • PDS-Statement of Legal Interest - STATEMENT-LEGAL-INTEREST 9-15-26

    Sept. 21, 2026 · 166 KB · PDS-Statement of Legal Interest

  • PDS-Receipts -

    Sept. 15, 2026 · 130 KB · PDS-Receipts

  • PDS-Application

    Sept. 9, 2026 · 230 KB · PDS-Application

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.