Annexation · Planning application
157-home development on 26 acres approved with annexation into Meridian
The city approved annexation and zoning for 26.34 acres, a preliminary plat with 157 building lots and 35 common lots, and a planned unit development with reduced setbacks in the denser area. Homes include detached and attached single-family. Decided March 16, 2021.
About this application
AZ of 26.34 acres with R-8 (6.64) & R-15 (19.69) zoning; PP for 157 building lots & 35 common lots on 26.34 acres; PUD w/a request for reduced setbacks in R-15
Project name on file: Pura Vida Ridge Ranch
Timeline
March 18, 2021
GIS Final Review: Entered In GIS
March 16, 2021
Public hearing: Meridian City Council
Outcome: D A Approved.
March 16, 2021
Decision: D A Approved
Meridian City Council: D A Approved.
Feb. 2, 2021
Final Action: Application Complete
Findings Signed on 1-20-2021
Jan. 19, 2021
Public hearing: Meridian City Council
Outcome: FF-CL Approved.
Jan. 19, 2021
Decision: FF-CL Approved
Meridian City Council: FF-CL Approved.
Jan. 6, 2021
City Council Hearing: Approved
Jan. 5, 2021
Public hearing: Meridian City Council
Dec. 3, 2020
City Council Hearing: Continued
Continued to 1-5-2021
Dec. 1, 2020
Public hearing: Meridian City Council
Oct. 29, 2020
Planning and Zoning Hearing: Recommend Approval
Oct. 22, 2020
Public hearing: Meridian Planning and Zoning Commission
Outcome: Recommended Approval.
Oct. 22, 2020
Recommended Approval
Meridian Planning and Zoning Commission: Recommended Approval.
Sept. 29, 2020
Community Development Review: Staff Recommend Approval w/ Cond
Sept. 17, 2020
Public hearing: Meridian Planning and Zoning Commission
Aug. 14, 2020
Parks Review: Review Complete w/ Cond
pathway conditions uploaded
Aug. 6, 2020
Public hearing: Meridian Planning and Zoning Commission
July 15, 2020
Floodplain Review: FLDP Required
Floodplain Development Permit required. Flood study complete. Culvert at Lake Hazel must be replaced as designed before building on lots in floodplain. Structures will require floodplain permits until LOMR is effective.
July 1, 2020
MPD Review: Review Complete w/ Cond
See police comments sent to clerks office Chris Johnson 7/1/20
June 29, 2020
MFD Plan Review: Review Complete w/ Cond
Comments uploaded to accela and emailed to the clerk.
June 26, 2020
Reclaimed Water Review: Connection NOT required
June 26, 2020
Floodplain Review: Manual Review Required
June 26, 2020
GIS Review: Review Complete
June 26, 2020
Transportation Plan Review: Review Complete w/ Cond
A street light plan will need to be included in the final plat application. Street light plan requirements are listed in section 6-7 of the City's Design Standards.
June 26, 2020
Transmit and Notice: Distribute for Plan Review
June 25, 2020
Plan Intake: Accepted
June 10, 2020
Water Modeling Review: Review Complete
See Engineering-Water Staff Report Comments
June 9, 2020
Planning Cursory Review: Return to Plan Intake
June 9, 2020
Plan Intake: Application Submitted
June 8, 2020
Wastewater Modeling Review: Review Complete
See Engineering-WW Staff Report Comments
June 8, 2020
Legal Description Review: Verified Legal Description
June 5, 2020
GIS Cursory Review: Entered in GIS
June 4, 2020
Reclaimed Water Review: Connection NOT required
June 4, 2020
Plan Intake: Cursory Review
June 4, 2020
Application filed
Documents
Staff reports
- Download Engineering staff report comments
June 8, 2020 · 12 KB · Viewable by All
- Download Updated engineering and wastewater staff report comments
June 8, 2020 · 12 KB · Viewable by All
Other documents
- Email Confirmatin Final Action Courtesy Letter
Jan. 28, 2021 · 839 KB · Viewable by All
- FD Comments REVISED
Sept. 12, 2020 · 468 KB · Plan Markup
- Pathways Comments
Aug. 14, 2020 · 51 KB · Viewable by All
- Engineering-Water Staff Report Comments_KK
June 10, 2020 · 18 KB · Viewable by All
- GIS COGO
June 8, 2020 · 2.4 MB · Viewable by All
- Updated WW Comments
June 8, 2020 · 3.6 MB · Viewable by All
- WW Comments
June 8, 2020 · 1.9 MB · Viewable by All
- Access Exhibit
June 4, 2020 · 1.8 MB · Viewable by All
- Autocad file
June 4, 2020 · 13.6 MB · Viewable by All
- AZ Exhibits
June 4, 2020 · 2.5 MB · Viewable by All
- Elevations
June 4, 2020 · 13.5 MB · Viewable by All
- Geotech Report
June 4, 2020 · 2.0 MB · Viewable by All
- Landscape Plan
June 4, 2020 · 17.5 MB · Viewable by All
- Open Space Exhibit
June 4, 2020 · 410 KB · Viewable by All
- Parking Plan
June 4, 2020 · 1.6 MB · Viewable by All
- Ped Plan
June 4, 2020 · 1.3 MB · Viewable by All
- Phasing Plan
June 4, 2020 · 169 KB · Viewable by All
- Site Amenity Plan
June 4, 2020 · 9.5 MB · Viewable by All
- Utility Plan
June 4, 2020 · 5.2 MB · Viewable by All