Conditional use · Planning application
52,000-square-foot church with 320 parking spaces approved in two phases
Meridian approved a conditional use permit for Poiema Calvary Chapel to build a church in two phases on about 7 acres. The Jan. 7, 2021, decision covers the full build-out and 320 parking spaces.
About this application
Conditional Use Permit request to construct a new church facility built in two phases to total 52,000 square feet at total build-out and 320 parking spaces on Lot 1, Block 2, approximately 7 acres, of Poiema Subdivision, zoned R-15.
Project name on file: Poiema Calvary Chapel
Timeline
Jan. 8, 2021
Application Complete: Done
Jan. 8, 2021
Final Action: Application Complete
Findings signed on 1-7
Jan. 7, 2021
Public hearing: Meridian Planning and Zoning Commission
Outcome: Approved.
Jan. 7, 2021
Decision: Approved
Meridian Planning and Zoning Commission: Approved.
Dec. 18, 2020
Application Complete: Done
Dec. 18, 2020
Planning and Zoning Hearing: Approved
Dec. 17, 2020
Public hearing: Meridian Planning and Zoning Commission
Nov. 20, 2020
Application Complete: Done
Nov. 20, 2020
Planning and Zoning Hearing: Continued
Nov. 19, 2020
Public hearing: Meridian Planning and Zoning Commission
Nov. 16, 2020
Application Complete: Done
Nov. 16, 2020
Community Development Review: Staff Recommend Approval w/ Cond
Oct. 30, 2020
Application Complete: Done
Oct. 30, 2020
Parks Review: Review Complete
No Pathways MP Interface -- Ten Mile Pathway is located on opposite side of Creek from church.
Oct. 26, 2020
Application Complete: Done
Oct. 26, 2020
Floodplain Review: FLDP Required
Required Hydraulic and Hydrologic study complete. Study indicates large portion of site is in the 1% floodplain. Culvert needs to be replaced as designed to remove area from floodplain. Floodplain Development Permit required. Requirements dependent on if culvert is replaced as designed.
Oct. 23, 2020
Application Complete: Done
Oct. 23, 2020
MFD Plan Review: Review Complete w/ Cond
Oct. 12, 2020
Application Complete: Done
Oct. 12, 2020
Water Modeling Review: Review Complete
See Engineering-Water Staff Report Comments
Oct. 9, 2020
Application Complete: Done
Oct. 9, 2020
Wastewater Modeling Review: Review Complete
See Engineering-WW Staff Report Comments
Oct. 9, 2020
Transportation Plan Review: Review Complete w/ Cond
A street light plan will need to be included in the final plat and/or building permit application. Street light plan requirements are listed in section 6-7 of the City's Design Standards. A future installation agreement for streetlight will be required for the streetlights on E. Lake Hazel Road due to an upcoming ACHD project
Oct. 8, 2020
Application Complete: Done
Oct. 8, 2020
MPD Review: No Comment
Oct. 8, 2020
GIS Review: Review Complete
Oct. 7, 2020
Application Complete: Done
Oct. 7, 2020
Reclaimed Water Review: Connection NOT required
Oct. 7, 2020
Floodplain Review: Manual Review Required
Oct. 7, 2020
Transmit and Notice: Distribute for Plan Review
Oct. 7, 2020
Legal Description Review: Verified Legal Description
Oct. 7, 2020
Planning Cursory Review: Return to Plan Intake
Oct. 7, 2020
GIS Cursory Review: No Comment
Oct. 7, 2020
Plan Intake: Cursory Review
Oct. 7, 2020
Plan Intake: Accepted
Sept. 24, 2020
Application Complete: Done
Sept. 24, 2020
Plan Intake: Application Submitted
Sept. 24, 2020
Application filed
Documents
Site plans
- Download Conditional use permit application package
Sept. 24, 2020 · 67.2 MB · Site Plans or Other Information
Other documents
- Email Confirmation Final Action Courtesy Letter
Jan. 28, 2021 · 1.0 MB · Viewable by All
- Engineering-Water Staff Report Comments_KK
Oct. 12, 2020 · 18 KB · Viewable by All
- Engineering-WW Staff Report Comments_TG
Oct. 9, 2020 · 13 KB · Viewable by All
- Application Materials
Oct. 7, 2020 · 30.8 MB · Viewable by All