Skip to content

Planning project · Planning application

9-unit multifamily development with affordable homes approved

The Hearing Examiner approved a small multifamily project of nine units, including some affordable units, on a site of about 0.62 acres. A public hearing was held July 10, and the decision came Feb. 27.

ApprovedPLN25-00300Filed April 7, 2025Collister · 3803 N Collister Dr+4 related filings
Site plan for 9-unit multifamily development with affordable homes approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Small multi-family development with affordable units included

Project name on file: 3803 N COLLISTER DR

Timeline

  1. Two days ago

    14 documents added

  2. Feb. 27, 2026

    Planning Applications: Project Entitled

  3. Jan. 12, 2026

    Pending Application Submittal: Planning Applications in Review

  4. Aug. 26, 2025

    Pending Application Submittal: Planning Applications in Review

  5. July 10, 2025

    Public hearing: Hybrid

  6. July 10, 2025

    IDR Review Complete: IDR Complete

  7. June 18, 2025

    Neighborhood Meeting Review: Completed

  8. May 14, 2025

    Concept Review Complete: Generate AWS

  9. May 14, 2025

    Concept Review Complete: CR Complete - Type 3

  10. April 30, 2025

    Concept Review Complete: Corrections Required

    A concept review meeting was held on 4/29/2025. Items discussed included consolidated vehicular access to Collister Drive, standards of the R-1C zone, pedestrian circulation, use-specific standards for multi-family uses, parking, landscaping, tree mitigation requirements, and building design standards. The layout provided does not address multiple code standards. The applicant also expressed interest in pursuing a variance from the requirement to provide detached sidewalk along Collister Drive. It was recommended that the applicant team contact the following agencies for preliminary input early in the process: Fire, Solid Waste, ACHD. An additional concept review meeting will be held after the proposed layout is further refined.

  11. April 22, 2025

    Concept Review Complete: Notes

    Move WF to Concept Review. EA no longer applies.

  12. April 7, 2025

    Application Submittal: Online

  13. April 7, 2025

    Application filed

Documents

Site plans

  • Site plan showing multifamily dwellings, open space, parking areas, pedestrian walkways, and landscaping, with OCR text partly garbled.

    June 23, 2025 · 1 page · 1.3 MB · PDS-Other Small Docs

    Download Site plan (IDR)
  • Site plan showing multifamily dwellings, open space, short- and long-term bicycle and vehicle parking, pedestrian walkways, and landscape trees and shrubs; OCR text is partly garbled.

    June 12, 2025 · 1 page · 2.5 MB · PDS-Other Small Docs

    Download Site plan with parking, open space and landscaping
  • May 14, 2025 · 3 pages · 460 KB · PDS-Concept Review Summary Report

    Download PDS-Concept Review Summary Report -
  • May 14, 2025 · 1 page · 3.8 MB · PDS-Other Small Docs

    Download Revised site plan
  • April 7, 2025 · 1 page · 1.6 MB · PDS-Other Small Docs

    Download Site plan drawing

Plans

  • Sign-in sheet from a June 11, 2025 neighborhood meeting on a multi-family development proposal, listing attendee names, addresses and emails.

    June 12, 2025 · 1 page · 300 KB · PDS-Other Small Docs

    Download Neighborhood meeting sign-in sheet

Notices

Application

Other documents

  • PDS-Other Small Docs - EXHIBIT C-3

    July 29, 2025 · 244 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - 7/10/2025

    July 18, 2025 · 313 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - ARBORIST'S REPORT 6/23/2025

    June 24, 2025 · 18.2 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - PAGE 1 OF ADDRESSES

    June 12, 2025 · 324 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - PAGE 2 OF ADDRESSES

    June 12, 2025 · 217 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.