Planning project · Planning application

772-square-foot accessory dwelling unit approved for single-family lot

The one-story backyard unit has an open living space, kitchen and bathroom, plus an attached carport. It was approved administratively on Jan. 7 and is intended as a home for the owner's mother. Existing mature trees are to stay.

ApprovedPLN25-00353Filed April 24, 2025Central Rim · 4509 W Rim St+2 related filings
Site plan for 772-square-foot accessory dwelling unit approved for single-family lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

ADU

Project name on file: 4509 W RIM ST

Timeline

  1. Two days ago

    12 documents added

  2. Dec. 23, 2025

    Planning Applications: Project Entitled

  3. Dec. 10, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  4. Dec. 10, 2025

    Concept Review Complete: CR Complete - Type 2

  5. Nov. 25, 2025

    Planning Applications: Additional CR Needed

    After the approval of the initial zoning certificate and issuance of the building permit, the owner reached out regarding a reasonable accommodation permit for a secondary access point to the ADU. *DPM 11/25

  6. June 4, 2025

    Pending Application Submittal: Planning Applications in Review

  7. May 8, 2025

    Concept Review Complete: CR Complete - Type 2

  8. May 2, 2025

    Concept Review Complete: Corrections Required

    I have a few comments regarding the proposed structure.• The Accessory structure (ADU) is not permitted to be in front of the primary dwelling. It appears on the site plan that the ADU comes out further than the primary dwelling. This would need to be addressed either by re-designing the site plan or going through a Conditional Use Application. Which I can provide further information if this is the route you decide to go.• ACHD & City prohibits multiple access points into one lot. The proposed concrete pad would need to be removed from plans or not provide parking for the ADU as that is not a requirement for ADU’s.

  9. April 24, 2025

    Application Submittal: Online

  10. April 24, 2025

    Application filed

Documents

Site plans

Plans

Project narrative

Application

Other documents

  • PDS-Concept Review Summary Report -

    Dec. 10, 2025 · 457 KB · PDS-Concept Review Summary Report

  • PDS-Other Small Docs - DETAILED LETTER OF EXPLANATION

    Dec. 1, 2025 · 86 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - GENERAL NOTES AND DOOR/WINDOW SCHEDULES

    Dec. 1, 2025 · 1.8 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - HOMEOWNER PROVIDED DETAILED LETTER OF EXPLANATION

    Dec. 1, 2025 · 24 KB · PDS-Other Small Docs

  • PDS-Concept Review Summary Report -

    May 8, 2025 · 450 KB · PDS-Concept Review Summary Report