Skip to content

Planning project · Planning application

Large child care center proposed in existing commercial building, no exterior changes

The application seeks approval for a large child care facility, which the site plan says is called Hygge Kinder House. No external changes to the building are planned. City staff are reviewing it administratively; no decision is on file.

In reviewPLN25-00621Filed July 23, 2025Downtown Boise · 506 S 11th St+1 related filing
Site plan for Large child care center proposed in existing commercial building, no exterior changes
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Large Childcare

Project name on file: 506 S 11TH ST

Timeline

  1. Aug. 25, 2025

    Pending Application Submittal: Planning Applications in Review

  2. Aug. 13, 2025

    Concept Review Complete: CR Complete - Type 2

  3. July 30, 2025

    Concept Review Complete: Notes

    Emailed to schedule CR 7/30

  4. July 23, 2025

    Application Submittal: Online

  5. July 23, 2025

    Application filed

Documents

Site plans

  • Supplemental materials describing the leased portion of the building, nearby sidewalks, trail access, street parking, reserved drop-off spaces, and photos of the building.

    July 23, 2025 · 3 pages · 18.9 MB · PDS-Other Small Docs

    Download Additional context for site plan from Hygge Kinder House
  • Site plan showing building layout, loading docks, entrances and square footage for nearby properties, noting no external building changes are required.

    July 23, 2025 · 2 pages · 2.0 MB · PDS-Other Small Docs

    Download Site plan for Hygge Kinder House

Other documents

  • PDS-Other Small Docs - DETAILS THE 4 PARKING SPOTS AVAILABLE TO FAMILIES FOR PICK UP AND DROP OFF, ONE OF WHICH IS ADA

    Aug. 25, 2025 · 8.7 MB · PDS-Other Small Docs

  • Statement of legal interest from landlord

    Aug. 25, 2025 · 44 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - THIS FURTHER OUTLINES THE SQUARE FOOTAGE OF THE CLASSROOMS ON THE SECOND PAGE AS WELL AS THE ANTICIPATED AGES AND KIDDOS WILL BE IN EACH.

    Aug. 25, 2025 · 1.2 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - THIS OUTLINES OUR STRATEGY TO MINIMIZE CONGESTION DURING DROP OFF AND PICK UP

    Aug. 25, 2025 · 66 KB · PDS-Other Small Docs

  • PDS-Concept Review Summary Report -

    Aug. 13, 2025 · 451 KB · PDS-Concept Review Summary Report

  • PDS-Application

    July 23, 2025 · 154 KB · PDS-Application

  • PDS-Other Small Docs - FLOOR PLANS

    July 23, 2025 · 201 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - FLOOR PLAN (WE DO HAVE A WATER FOUNTAIN THAT IS MISSING AND IS LOCATING ON THE HALLWAY THAT IS ON THE OTHER SIDE OF THE WASHER AND DRYER)

    July 23, 2025 · 201 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - PROJECT DESCRIPTION FOR HYGGE KINDER HOUSE

    July 23, 2025 · 90 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - THIS IS AN UPDATED DOCUMENT FOR ADDITIONAL SITE PLAN MATERIALS, I CANNOT FIGURE OUT HOW TO DELETE THE FIRST VERSION. SORRY!

    July 23, 2025 · 18.9 MB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.