Planning project · Planning application
New single-family home approved on vacant lot
City staff approved plans for one single-family house on a vacant 0.44-acre lot. The approval was an administrative decision made Sept. 30, 2026, without a public hearing.

About this application
New single-family dwelling on existing vacant Lot
Project name on file: 1621 S STONE RIDGE WAY - CFH
Timeline
Yesterday
5 documents added
May 26, 2026
Planning Applications: Project Entitled
Dec. 15, 2025
Pending Application Submittal: Planning Applications in Review
Dec. 11, 2025
Planning Applications: Generate Additional Application
Sept. 3, 2025
Concept Review Complete: Hillside Questionnaire Needed
Sept. 3, 2025
Concept Review Complete: Engineering Preview
Sept. 3, 2025
Concept Review Complete: Engineering Preview Complete
A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report; structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical; and civil plans.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.
Sept. 3, 2025
Concept Review Complete: CR Complete - Type 2
Sept. 2, 2025
Application Submittal: Online
Sept. 2, 2025
Application filed
Documents
Site plans
- Download PDS-Other Small Docs - NEW CONSTRUCTION HOME.
Sept. 2, 2025 · 1 page · 537 KB · PDS-Other Small Docs
Project narrative
- Download PDS-Concept Review Summary Report -
Sept. 3, 2025 · 2 pages · 448 KB · PDS-Concept Review Summary Report
Application
- Download Planning project application form for new single-family home
Application for new home construction on an R-1A zoned lot, with a required Hillside Questionnaire referenced and electronic owner certification.
Sept. 2, 2025 · 2 pages · 154 KB · PDS-Application
Other documents
- PDS-Other Small Docs - HILLSIDE
Sept. 3, 2025 · 680 KB · PDS-Other Small Docs
- Download PDS-Other Small Docs - WE WOULD LIKE TO BUILD A NEW CONSTRUCTION HOME ON THIS SITE.
Sept. 2, 2025 · 1 page · 673 KB · PDS-Other Small Docs