Skip to content

Planning project · Planning application

Conversion of attached outbuilding into accessory dwelling unit approved

The city approved turning an existing outbuilding of about 586 square feet, which already has a kitchenette and bathroom, into an accessory dwelling next to a two-bedroom house. The approval was issued Feb. 20 by city staff.

ApprovedPLN25-00875Filed Oct. 6, 2025West Valley · 9641 W Cook Ln+1 related filing
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

ADU

Project name on file: 9641 W COOK LN

Timeline

  1. Feb. 20, 2026

    Planning Applications: Project Entitled

  2. Dec. 2, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Nov. 14, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Oct. 22, 2025

    Concept Review Complete: Corrections Required

    Emailed regarding corrections

  5. Oct. 6, 2025

    Application Submittal: Online

  6. Oct. 6, 2025

    Application filed

Documents

Project narrative

  • Advisory concept review notes covering an accessory dwelling unit conversion, setback corrections, ADU size limits, and design compatibility requirements.

    Nov. 14, 2025 · 2 pages · 460 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

Other documents

  • Fire flow and statement of legal interest

    Oct. 6, 2025 · 696 KB · PDS-Other Small Docs

  • Aerial map from the Ada County Assessor showing parcels, roads and aerial imagery, with a disclaimer that it is for general reference only and not for navigation or legal use.

    Oct. 6, 2025 · 1 page · 620 KB · PDS-Other Small Docs

    Download Overhead map of property
  • Ada County property lookup printout showing parcel, owner, zoning (R-1C), acreage and subdivision details for the site.

    Oct. 6, 2025 · 2 pages · 101 KB · PDS-Other Small Docs

    Download Property layout and ownership details sketch

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.