Planning project · Planning application
8-lot single-family subdivision on about 1 acre withdrawn
The plan would have divided a 1.03-acre site into eight single-family homes. The application, filed Dec. 8, 2025, was withdrawn before the City Council made a decision.
About this application
Single-family subdivision in the Hillside
Project name on file: 6021 N EUGENE LN
Timeline
Two days ago
7 documents added
Dec. 30, 2025
Project Cancellation: Withdrawn
Dec. 29, 2025
Concept Review Complete: Generate AWS
Dec. 29, 2025
Concept Review Complete: CR Complete - Type 4
Dec. 12, 2025
Concept Review Complete: Engineering Preview Complete
For a subdivision within the Hillside Overlay you are typically looking at a Category III hillside application. Our Hillside technical manual (HTM) is a bit outdated on the process elements but is accurate when it comes to the technical documents and elements specified within. You’d be looking at the documents associated with Subdivisions for this project. There are several routes you can take the engineering for the project either lot by lot or all at once depending on how you are planning to build out. The goal of the CFH is to establish feasibility and set some boundary conditions around the final build out of the lots. For example, lots padded during subdivision grading leave little to review for individual lot build, so require no additional planning applications. Lots not yet designed must provide enough preliminary info to set final intent (daylight basements, stepped foundations, etc). Lots not fully prepared may require additional Category II permits when plans for individual lot build out are submitted for permitting, extending requirements and review timelines substantially in some cases.Preliminary Plat - Category III CFH - HTM – Preliminary DocumentsThe Category III application is run simultaneously with the Preliminary Plat. It is expected to have a more complete level of engineering plans and documents than typically associated with preliminary plats at this stage. Anything engineering testing or plans required to prove feasibility are required at this stage, while corrections or additional documents required for full building permits will be conditioned with Cat III/Preliminary Plat approval.Final Plat - Grading Permit – HTM Final DocumentsGrading Permit & Final plat are required to have approvals from all relevant agencies prior to permit issuance for construction (ACHD, Veolia, sewer, etc). This review is where we complete theMylar – HTM Construction ReportingCompaction Testing, fully surveyed record drawings, geotechnical sign off letter, civil sign off letter, geologist sign off letter, and grading contractor sign off are all required prior to signature of final plat. PW Hillside does not allow for any bonding on hillside subdivisions except for final revegetation reporting, which is required to have a bond in place for a minimum of 1 year or until 80% revegetation success of all slopes has been accomplished.
Dec. 11, 2025
Concept Review Complete: Engineering Preview
Dec. 8, 2025
Application Submittal: Online
Dec. 8, 2025
Application filed
Documents
Other documents
- PDS-Concept Review Summary Report -
Dec. 29, 2025 · 466 KB · PDS-Concept Review Summary Report
- PDS-Other Small Docs - SUPPLEMENTAL CONCEPT REVIEW NOTES 12/18/2025
Dec. 29, 2025 · 89 KB · PDS-Other Small Docs
- PDS-Other Small Docs - UPDATED SITE PLAN 12/17/2025
Dec. 18, 2025 · 2.2 MB · PDS-Other Small Docs
- PDS-Application
Dec. 8, 2025 · 158 KB · PDS-Application
- PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE
Dec. 8, 2025 · 700 KB · PDS-Other Small Docs
- PDS-Other Small Docs - PROJECT DESCRIPTION
Dec. 8, 2025 · 71 KB · PDS-Other Small Docs
- PDS-Other Small Docs - PROPOSED SITE PLAN
Dec. 8, 2025 · 1.3 MB · PDS-Other Small Docs