Skip to content

Planning project · Planning application

Single-family home with retaining walls approved on half-acre hillside lot

City staff approved plans for one single-family home with retaining walls on a 0.51-acre lot in the hillside overlay on March 13. The project still needs a geotechnical report and engineering for the retaining walls.

ApprovedPLN25-01108Filed Dec. 17, 2025Barber Valley · 5808 E Millet Dr+2 related filings
Site plan for Single-family home with retaining walls approved on half-acre hillside lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Single-family home with retaining walls in the hillside overlay.

Project name on file: 5808 E MILLET DR

Timeline

  1. Two days ago

    11 documents added

  2. March 13, 2026

    Planning Applications: Project Entitled

  3. Dec. 23, 2025

    Pending Application Submittal: Planning Applications in Review

  4. Dec. 23, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); and structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical (these requirements will be assessed again at the time of occupancy).NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  5. Dec. 23, 2025

    Concept Review Complete: CR Complete - Type 2

  6. Dec. 19, 2025

    Concept Review Complete: Engineering Preview

  7. Dec. 17, 2025

    Application Submittal: Online

  8. Dec. 17, 2025

    Application filed

Documents

Site plans

Plans

Project narrative

Application

Other documents

  • PDS-Agency Comments - HILLSIDE RETAINING WALL PERMITTING_OCTOBER2025

    Dec. 23, 2025 · 804 KB · PDS-Agency Comments

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE

    Dec. 17, 2025 · 700 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.