Planning project · Planning application
Single-family home proposed on foothills lot under hillside rules
The plan calls for one house on about a quarter-acre lot. City planners say it needs the stricter hillside review because of slope and unstable soils, and a geotechnical report is expected. The application is under administrative review.

About this application
No description has been published for this record yet.
Project name on file: 3623 E ASTEROID CT
Timeline
Yesterday
4 documents added
June 29, 2026
Pending Application Submittal: Planning Applications in Review
March 26, 2026
Concept Review Complete: CR Complete - Type 2
March 25, 2026
Concept Review Complete: Engineering Preview
March 25, 2026
Concept Review Complete: Engineering Preview Complete
A determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report; structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, having a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.
March 24, 2026
Application Submittal: Online
March 24, 2026
Application filed
Documents
Site plans
- Download PDS-Other Small Docs - BOULDER POINT L30 B10 SITE PLAN
March 24, 2026 · 1 page · 300 KB · PDS-Other Small Docs
Project narrative
- Download PDS-Concept Review Summary Report -
March 26, 2026 · 2 pages · 465 KB · PDS-Concept Review Summary Report
Application
- Download PDS-Application
March 24, 2026 · 2 pages · 158 KB · PDS-Application
Other documents
- PDS-Other Small Docs - BOULDER POINT L30 B10 PW QUESTIONNAIRE
March 24, 2026 · 700 KB · PDS-Other Small Docs