Planning project · Planning application
Single-family home proposed on 0.21-acre lot in Boise's Hillside Overlay
The plan calls for one house on a 0.21-acre vacant lot in the Hillside Overlay, which adds extra review for building on slopes. City staff are reviewing it administratively, so no public hearing is listed.

About this application
Single-family home in Hillside Overlay
Project name on file: 3606 E ASTEROID CT
Timeline
Two days ago
6 documents added
Aug. 13, 2026
Pending Application Submittal: Planning Applications in Review
Aug. 6, 2026
Concept Review Complete: CR Complete - Type 2
Aug. 4, 2026
Concept Review Complete: Engineering Preview Complete
Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents (please submit them with subsequent applications), additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall system that is greater than four feet in height from top of foundation to top of wall, that has more than one wall when the interior horizontal distance between the walls is less than 10 feet and the total height of all walls exceeds four feet, that has a surcharge, that has a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Please refer to the Hillside Development Requirements for Technical Reports for grading & drainage plan and geotechnical report requirements.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted to and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.
Aug. 3, 2026
Concept Review Complete: Engineering Preview
July 30, 2026
Application Submittal: Online
July 30, 2026
Application filed
Documents
Site plans
- Download PDS-Other Small Docs - BOULDER POINT L21 B10 SITE PLAN
July 30, 2026 · 1 page · 1.1 MB · PDS-Other Small Docs
Application
- Download PDS-Application
July 30, 2026 · 2 pages · 154 KB · PDS-Application
Other documents
- PDS-Concept Review Summary Report -
Aug. 6, 2026 · 453 KB · PDS-Concept Review Summary Report
- PDS-Concept Review Summary Report -
Aug. 6, 2026 · 453 KB · PDS-Concept Review Summary Report
- PDS-Agency Comments - HILLSIDE RETAINING WALL PERMITTING_OCTOBER2025
Aug. 4, 2026 · 804 KB · PDS-Agency Comments
- PDS-Other Small Docs - BOULDER POINT L21 B10 PW QUESTIONNAIRE
July 30, 2026 · 678 KB · PDS-Other Small Docs