Skip to content

Planning project · Planning application

140-unit apartment project proposed in Central Bench

Hawkins Companies seeks to build up to 140 multifamily units on a site in the Central Bench. A Design Review Commission hearing was held Sept. 30, and the application is still in city review.

In reviewPLN26-00457Filed May 12, 2026Vista · 3412 S Lindsay Ave+8 related filings
Site plan for 140-unit apartment project proposed in Central Bench
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Multi Family Development

Project name on file: 3412 S LINDSAY AVE

Timeline

  1. Sept. 30, 2026

    Public hearing: Hybrid

  2. Sept. 21, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 10, 2026

    IDR Review Complete: IDR Complete

  4. July 2, 2026

    Neighborhood Meeting Review: Completed

  5. June 1, 2026

    Concept Review Complete: CR Complete - Type 3

  6. May 12, 2026

    Application Submittal: Online

  7. May 12, 2026

    Application filed

Documents

Site plans

  • Invitation to a June 23, 2026 neighborhood meeting on a proposed 138-unit multi-family Design Review project, with a preliminary site plan (sheet SP-5) and a 500-foot radius notice list.

    July 2, 2026 · 14 pages · 13.1 MB · PDS-Other Small Docs

    Download Neighborhood meeting invitation and preliminary site plan
  • Invitation to a June 23, 2026 neighborhood meeting on a proposed 138-unit multi-family Design Review project, with a preliminary site plan (sheet SP-5) and a 500-foot radius notice list.

    July 2, 2026 · 14 pages · 13.1 MB · PDS-Other Small Docs

    Download Neighborhood meeting invitation and preliminary site plan
  • Site data for a conceptual site plan showing 4.835 acres, three residential buildings plus a clubhouse totaling 100,433 sq ft, 216 parking spaces, and 29,278.77 sq ft of open space.

    May 12, 2026 · 1 page · 786 KB · PDS-Other Small Docs

    Download Preliminary site plan, sheet SP-4c

Plans

  • Cover letter and question list for a concept plan review proposing up to 140 multi-family units on about five acres, with a conceptual site plan sheet showing buildings B-1 through B-3.

    July 16, 2026 · 5 pages · 6.3 MB · PDS-Other Small Docs

    Download Concept plan narrative and conceptual site plan
  • Architect's exterior elevation sheet for Building Type 1 apartments, with side, front, and rear elevations, a materials legend, and material percentages by facade.

    June 1, 2026 · 1 page · 3.9 MB · PDS-Other Small Docs

    Download Building type 1 exterior elevations and materials
  • June 1, 2026 · 2 pages · 9.8 MB · PDS-Other Small Docs

    Download Updated context drawing

Project narrative

  • Cover letter from Hawkins Companies proposing up to 140 multi-family units on roughly five acres in an R-2 zone, and anticipating a DR-Major review before building permits.

    May 12, 2026 · 1 page · 154 KB · PDS-Other Small Docs

    Download Project description letter for concept plan review

Application

  • Application for a up to 140-unit multi-family project with clubhouse and amenities in an R-2 zone, filed by Hawkins Companies as applicant.

    May 12, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summary of July 30, 2026 interdepartmental review of a multi-family development up to 140 units, with Public Works solid waste enclosure and truck maneuvering recommendations.

    Aug. 10, 2026 · 10 pages · 846 KB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report

Other documents

  • Aerial map

    May 12, 2026 · 215 KB · PDS-Other Small Docs

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.