Subdivision · Planning application
13-lot subdivision with open space proposed on 3.18 acres, now on hold
The plan would create 13 buildable lots, one open space lot and one common driveway lot. The city returned the application to the applicant, so it is on hold before any City Council decision.

About this application
No description has been published for this record yet.
Project name on file: Garner Vines
Timeline
Sept. 10, 2026
Review Complete: Corrections Required
Sept. 10, 2026
Current Planning: Corrections Required
Aug. 24, 2026
Current Planning: In Review
Aug. 24, 2026
Assign Reviewers: Completed
June 25, 2026
Review Complete: Corrections Required
June 25, 2026
Current Planning: Corrections Required
May 20, 2026
Current Planning: In Review
May 20, 2026
Assign Reviewers: Completed
April 23, 2026
Review Complete: Corrections Required
April 23, 2026
Current Planning: Corrections Required
Feb. 19, 2026
Current Planning: In Review
Feb. 19, 2026
Assign Reviewers: Completed
Aug. 28, 2025
Review Complete: Corrections Required
Aug. 28, 2025
Current Planning: Corrections Required
July 14, 2025
Current Planning: In Review
July 14, 2025
Assign Reviewers: Completed
July 10, 2025
Fee Payment: Payment Received
Nov. 4, 2024
Prescreen Review: Passed
Nov. 1, 2024
Prescreen Review: In Progress
Nov. 1, 2024
Application Submittal: ePlanReview
Oct. 8, 2024
Application Submittal: Online
Oct. 8, 2024
Application filed
Documents
Plans
- Download Approved subdivision plans for Veolia
Approved-for-construction plan sheet for a subdivision, showing lot numbers and street layout, stamped with a 7/10/2025 date and a 9-16-22 engineer date.
Feb. 27, 2026 · 1 page · 1.6 MB · PDS-Maps and Drawings
- Download Final plat, Garner Vines Subdivision
Final plat sheets with survey narrative, boundary records, and notes for a subdivision creating 13 buildable lots, one open space lot, and one common drive lot.
Feb. 27, 2026 · 5 pages · 984 KB · PDS-Maps and Drawings
- Download Landscape plan, sheets L1-L3
Landscape plan for the Garner Vines Subdivision showing tree removals, retained trees, fencing and a plant schedule with Boise ordinance landscape notes.
Feb. 27, 2026 · 3 pages · 451 KB · PDS-Maps and Drawings
Project narrative
- Download Redlined plat plan and survey narrative
Survey narrative and plat sheet for a 13-lot subdivision with open space and common drive lots, with boundary notes, easement details and redline markings.
June 5, 2026 · 5 pages · 9.3 MB · PDS-Other Small Docs
- Download PDS-Other Small Docs - LETTER OF INTENT 7/10/25
Feb. 27, 2026 · 1 page · 110 KB · PDS-Other Small Docs
Application
- Download Assured Water Supply Application B (blank form)
Application B form for developers seeking Assured Water Supply certification for development within a water district's service area, with the applicant information section partly filled in.
Feb. 27, 2026 · 13 pages · 1.5 MB · PDS-Other Small Docs
- Download Subdivision application form, final plat
Application for a 15-lot residential subdivision (13 buildable, 2 common) in an R-1B zone, with a 3.18-acre property and a representative filing on the applicant's behalf.
Nov. 1, 2024 · 3 pages · 199 KB · PDS-Application
Correspondence
- Download Ada County plat review comment sheet
Surveyor's plat review comments from Ada County Development Services on a subdivision plat, covering unpaid fees, unclosed lots, easement references and sheet-level label corrections.
June 5, 2026 · 5 pages · 360 KB · PDS-Other Small Docs
- Download Central District Health comments on subdivision
Central District Health's transmittal checks the no-objection box and sets conditions for sewage and water, including a possible septic permit limit on a split-off lot.
March 5, 2026 · 1 page · 1.0 MB · PDS-Agency Comments
- Download Water pressure and flow availability letter from Veolia Water
Veolia Water Idaho reports available pressure and flow at the nearest hydrant for fire sprinkler design, under maximum-day system conditions.
Feb. 27, 2026 · 1 page · 60 KB · PDS-Other Small Docs
- Download Veolia will-serve letter for water service
Veolia states the subdivision can be served by its water system under current tariffs, noting developer-funded main extensions, new mains, services and hydrants, and a twelve-month validity.
Feb. 27, 2026 · 1 page · 82 KB · PDS-Other Small Docs
Other documents
- Checklist
Feb. 27, 2026 · 724 KB · PDS-Other Small Docs
- Statement of legal interest
Feb. 27, 2026 · 475 KB · PDS-Statement of Legal Interest
- Transmittal to review agencies
Feb. 27, 2026 · 136 KB · PDS-Transmittal Agencies
- Receipt
July 10, 2025 · 131 KB · PDS-Receipts