Skip to content

Planning project · Planning application

4-story office building with ground-floor commercial space approved

The Design Review Commission approved the mixed-use building on Nov. 7. It would have about 119,000 square feet, structured parking and no homes, on a site of just over a third of an acre. Vehicle access would be from the alley.

ApprovedPLN25-00204Filed March 10, 2025North End · 500 W Washington St+5 related filings
Site plan for 4-story office building with ground-floor commercial space approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Office building

Project name on file: 500 W WASHINGTON ST

Timeline

  1. Two days ago

    7 documents added

  2. Nov. 7, 2025

    Planning Applications: Project Entitled

  3. Oct. 9, 2025

    Planning Applications: Generate Additional Application

  4. Oct. 9, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  5. Sept. 12, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  6. Aug. 13, 2025

    Planning Applications: Project Entitled

  7. June 10, 2025

    Planning Applications: Notes

    WF Reset per Age and EA Change

  8. June 2, 2025

    Pending Application Submittal: Planning Applications in Review

  9. May 28, 2025

    Planning Applications: Generate Additional Application

    Regenerate child apps per S. Mortensen, due to Primary Contact change.

  10. May 23, 2025

    IDR Review Complete: IDR Complete With Recommendations

  11. May 23, 2025

    Neighborhood Meeting Review: Completed

  12. May 15, 2025

    Public hearing: Hybrid

  13. May 7, 2025

    Neighborhood Meeting Review: Notes

    AWS is Voided/Cancelled for this project. This commercial redevelopment project is not located in the Southeast Boise GWMA. AWS does not apply.

  14. April 16, 2025

    Concept Review Complete: Generate AWS

  15. April 16, 2025

    Concept Review Complete: CR Complete - Type 3

  16. April 16, 2025

    Early Assistance Review: Send to Concept Review

  17. March 19, 2025

    Early Assistance Review: Corrections Required

    Please upload a conceptual site plan and project narrative or email the documents to smortensen@cityofboise.org

  18. March 10, 2025

    Application Submittal: Online

  19. March 10, 2025

    Application filed

Documents

Site plans

  • Stack Rock Group city review set (dated 04.03.25) with an existing tree plan; notes existing trees to be removed pending an arborist report.

    April 9, 2025 · 8 pages · 2.0 MB · PDS-Other Small Docs

    Download Site plan and perspectives

Plans

  • Revised floor-area totals, bike parking requirements and stall counts (93 provided) for the building, submitted May 14, 2025.

    May 14, 2025 · 5 pages · 1.4 MB · PDS-Other Small Docs

    Download Updated building info and bike parking calculations
  • Stack Rock Group landscape sheet L010 marked preliminary, not for construction, showing existing trees with removals pending an arborist report.

    May 2, 2025 · 8 pages · 2.0 MB · PDS-Other Small Docs

    Download Existing tree plan, city review set

Project narrative

  • Boise City staff summary of an advisory concept review for a 4-story mixed-use building with structured parking, covering parking, access and bicycle parking requirements.

    April 16, 2025 · 3 pages · 461 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Notices

  • Invitation to the May 5, 2025 neighborhood meeting for a proposed four-story office building, with the notice mailing list of nearby addresses attached.

    May 23, 2025 · 8 pages · 3.5 MB · PDS-Neighborhood Meeting

    Download Neighborhood meeting invitation letter and mailing list

Application

  • Application form for an office building and parking structure in the MX-3 zone, with applicant Ahlquist and owner Idaho Farm Bureau Federation.

    March 10, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summary of the May 15, 2025 staff review of a proposed 4-story mixed-use building, with preliminary Public Works comments on solid waste service and a required solid waste narrative.

    May 20, 2025 · 7 pages · 511 KB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report

Nearby

Planning project · Planning application

Planning project

ApprovedDecided Nov. 7, 2025PLN25-00703North End · 720 W Fort St0.3 mi away

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.