Skip to content

Planning project · Planning application

Swim spa, deck expansion and new patio sought for hillside home

The application would add a mostly above-ground swim spa, expand a deck and build a patio on a 0.35-acre residential lot in hillside and wildland-urban interface areas. City staff will review it administratively. It was filed Aug. 8.

SubmittedPLN25-00670Filed Aug. 8, 2025East End · 573 N Morningside Way+1 related filing
Site plan for Swim spa, deck expansion and new patio sought for hillside home
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Swim spa, deck expansion, and new patio in Hillside and Wildland Urban Interface overlays

Project name on file: 573 N MORNINGSIDE WAY

Timeline

  1. Oct. 30, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with a possibility of a global slope stability analysis (geotech to comment on why one is not needed); structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical; and civil plans.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  2. Oct. 30, 2025

    Concept Review Complete: CR Complete - Type 2

  3. Oct. 29, 2025

    Concept Review Complete: Engineering Preview

  4. Aug. 8, 2025

    Concept Review Complete: Hillside Questionnaire Needed

  5. Aug. 8, 2025

    Application Submittal: Online

  6. Aug. 8, 2025

    Application filed

Documents

Plans

  • Dimensioned site and construction drawing notes for rebuilding decks, adding a walkway, a swim spa and a patio cover, with setback measurements and framing and paver specifications.

    Oct. 27, 2025 · 3 pages · 375 KB · PDS-Maps and Drawings

    Download Proposed deck, patio and swim spa construction plan

Project narrative

Application

Other documents

  • PDS-Concept Review Summary Report -

    Oct. 30, 2025 · 457 KB · PDS-Concept Review Summary Report

  • PDS-Other Small Docs - LICENSE AGREEMENT BETWEEN CITY AND HOA

    Oct. 30, 2025 · 1.4 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - MOU BETWEEN CITY AND HOA

    Oct. 30, 2025 · 1.3 MB · PDS-Other Small Docs

  • PDS-Other Small Docs -

    Oct. 29, 2025 · 677 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.