Planning project · Planning application
Deck addition on a steep hillside lot approved
City staff approved a deck addition to an existing home on a 0.35-acre lot in a hillside area on Oct. 2. The project needed hillside review because of slope and soil conditions, and technical reports may be required.

About this application
Addition in Hillside
Project name on file: 573 N MORNINGSIDE WAY
Timeline
Yesterday
9 documents added
Oct. 2, 2026
Planning Applications: Project Entitled
June 5, 2026
Pending Application Submittal: Planning Applications in Review
June 1, 2026
Concept Review Complete: CR Complete - Type 2
May 20, 2026
Concept Review Complete: Engineering Preview Complete
Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall system that is greater than four feet in height from top of foundation to top of wall, that has more than one wall when the interior horizontal distance between the walls is less than 10 feet and the total height of all walls exceeds four feet, that has a surcharge, that has a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Please refer to the Hillside Development Requirements for Technical Reports for grading & drainage plan and geotechnical report requirements.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.
May 20, 2026
Concept Review Complete: Notes
awaiting license agreement from county
May 19, 2026
Concept Review Complete: Engineering Preview
May 5, 2026
Concept Review Complete: Corrections Required
Per email - please upload hillside questionnaire and provide the distance from the top of the rock wall to the face of the deck. This must be 30' to satisfy WUI requirements.
April 29, 2026
Application Submittal: Online
April 29, 2026
Application filed
Documents
Site plans
- Download Updated site plan
May 18, 2026 · 1 page · 1.5 MB · PDS-Other Small Docs
- Download Site plan (sheet 1)
April 29, 2026 · 1 page · 1.0 MB · PDS-Other Small Docs
- Download Site plan, revision 2
April 29, 2026 · 1 page · 576 KB · PDS-Other Small Docs
- Download Site plan 3
April 29, 2026 · 1 page · 646 KB · PDS-Other Small Docs
Project narrative
- Download Concept review summary
Advisory concept review notes for a deck addition in a hillside area, classed as a Category II Hillside project, with required geotechnical and retaining wall documentation.
June 1, 2026 · 3 pages · 472 KB · PDS-Concept Review Summary Report
Application
- Download Planning project application for deck and patio cover
Application for a deck and patio cover using WUI-approved decking, with engineering to be provided during permitting after Fire Marshal consultation.
April 29, 2026 · 2 pages · 159 KB · PDS-Application
Other documents
- PDS-Agency Comments - HILLSIDE RETAINING WALL PERMITTING_OCTOBER2025
May 20, 2026 · 804 KB · PDS-Agency Comments
- PDS-Other Small Docs - EMAIL FROM FIRE MARSHAL
May 19, 2026 · 273 KB · PDS-Other Small Docs
- PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE
May 5, 2026 · 698 KB · PDS-Other Small Docs