Skip to content

Planning project · Planning application

Pool approved for single-home lot in Hillside Overlay

City staff approved plans for a swimming pool on a 0.32-acre residential lot in the Hillside Overlay. The administrative decision was made Oct. 5, 2026, and the project is now entitled.

ApprovedPLN25-00765Filed Sept. 3, 2025Highlands · 925 W Highland View Dr+1 related filing
Site plan for Pool approved for single-home lot in Hillside Overlay
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Pool in Hillside Overlay

Project name on file: 925 W HIGHLAND VIEW DR

Timeline

  1. March 24, 2026

    Planning Applications: Project Entitled

  2. Sept. 14, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  3. Sept. 8, 2025

    Planning Applications: Generate Additional Application

  4. Sept. 8, 2025

    Pending Application Submittal: Planning Applications in Review

  5. Sept. 8, 2025

    Concept Review Complete: CR Complete - Type 2

  6. Sept. 3, 2025

    Concept Review Complete: Engineering Preview

  7. Sept. 3, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with a possibility of global slope stability analysis; structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical; and civil plans.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.

  8. Sept. 3, 2025

    Application Submittal: Online

  9. Sept. 3, 2025

    Application filed

Documents

Site plans

Other documents

  • PDS-Concept Review Summary Report -

    Sept. 8, 2025 · 444 KB · PDS-Concept Review Summary Report

  • PDS-Application

    Sept. 3, 2025 · 154 KB · PDS-Application

  • PDS-Letter of Intent - LETTER OF EXPLANATION

    Sept. 3, 2025 · 26 KB · PDS-Letter of Intent

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE

    Sept. 3, 2025 · 31 KB · PDS-Other Small Docs

Nearby

Foothills/hillside · Planning application

Foothills/hillside

ApprovedFiled Oct. 2, 2025CFH25-00083Highlands · 1366 W Parkhill Dr0.3 mi away+1 related filing

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.