Skip to content

Planning project · Planning application

Single-family home in hillside area approved by city staff

The city approved plans for one single-family home on a 0.2-acre lot in a hillside overlay. The decision was made administratively on March 2, without a public hearing.

ApprovedPLN25-00996Filed Nov. 11, 2025Warm Springs Mesa · 3588 E Asteroid Dr+1 related filing
Site plan for Single-family home in hillside area approved by city staff
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Single-family home in hillside overlay

Project name on file: 3588 E ASTEROID DR

Timeline

  1. Jan. 30, 2026

    Planning Applications: Project Entitled

  2. Nov. 14, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Nov. 14, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Nov. 12, 2025

    Concept Review Complete: Engineering Preview

  5. Nov. 12, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN ); structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical (these requirements will be assessed again at the time of occupancy); and civil plans.Additionally, rock piles shall be removed prior to construction of the home. The Geotechnical Engineer shall comment in their report that all rock material shall been removed from the site and a site inspection report shall indicate that the rock removal is complete and the site is suitable for construction.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  6. Nov. 11, 2025

    Application Submittal: Online

  7. Nov. 11, 2025

    Application filed

Documents

Site plans

  • Site plan sheet for Boulder Point lot 19, block 10, containing general construction notes on code compliance, drainage grading, and setbacks.

    Nov. 11, 2025 · 1 page · 733 KB · PDS-Other Small Docs

    Download Site plan with general notes and specifications

Project narrative

Application

Other documents

  • PDS-Agency Comments - HILLSIDE RETAINING WALL PERMITTING_OCTOBER2025

    Nov. 12, 2025 · 804 KB · PDS-Agency Comments

Nearby

Foothills/hillside · Planning application

Foothills/hillside

ApprovedFiled Nov. 4, 2025CFH25-00089Warm Springs Mesa · 3596 E Asteroid Dr70 ft away+1 related filing

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.