Skip to content

Planning project · Planning application

Home addition and new garage with apartment above approved in historic district

The approval covers an interior remodel and addition to a Tudor Revival house, plus a new three-car garage with a one-bedroom accessory dwelling above, replacing the old garage and shed. The city approved it Oct. 2 at staff level.

ApprovedPLN25-01038Filed Nov. 25, 2025North End · 1919 N 21st St+4 related filings
Site plan for Home addition and new garage with apartment above approved in historic district
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Addition, new detached garage with ADU above

Project name on file: 1919 N 21st St

Timeline

  1. Two days ago

    8 documents added

  2. Oct. 2, 2026

    Planning Applications: Project Entitled

  3. Sept. 1, 2026

    Planning Applications: Project Entitled

  4. July 14, 2026

    Pending Application Submittal: Planning Applications in Review

  5. March 18, 2026

    Pending Application Submittal: Planning Applications in Review

  6. March 4, 2026

    Planning Applications: Generate Additional Application

  7. March 3, 2026

    Planning Applications: Notes

    Re-opened per G.Flores

  8. Feb. 6, 2026

    Planning Applications: Project Entitled

  9. Jan. 12, 2026

    Pending Application Submittal: Planning Applications in Review

  10. Dec. 11, 2025

    IDR Review Complete: IDR Waived

  11. Dec. 11, 2025

    Neighborhood Meeting Review: Not Required

  12. Dec. 10, 2025

    Concept Review Complete: CR Complete - Type 3

  13. Dec. 3, 2025

    Concept Review Complete: Notes

    emailed Mike Harrison mharrison101@hotmail.com at the Boise Canal Company for feedback

  14. Dec. 1, 2025

    Concept Review Complete: Corrections Required

    Please label each room in the house for it's use and label any applicances.

  15. Nov. 25, 2025

    Application Submittal: Online

  16. Nov. 25, 2025

    Application filed

Documents

Site plans

  • Sheet showing general construction notes, legend and existing site conditions, including the existing residence, garage, shed and property line markers, for a residence and accessory dwelling unit project.

    Nov. 25, 2025 · 12 pages · 5.5 MB · PDS-Other Small Docs

    Download Existing site plan and reference notes

Plans

  • Sheet of general notes and an existing site plan for a Pivot North Architecture project, dated 09/18/2025, covering benchmarks, grading coordination, and curb and fence details.

    Dec. 3, 2025 · 11 pages · 5.6 MB · PDS-Other Small Docs

    Download Architectural site plan notes and existing site plan, progress set

Project narrative

  • Describes the historic district context, existing house and site conditions, and a two-phase scope: interior and mudroom remodel of the main residence, then a garage and ADU replacing the existing garage and shed.

    Nov. 25, 2025 · 1 page · 162 KB · PDS-Other Small Docs

    Download Project description narrative

Notices

  • Notice inviting neighbors to a March 2 pre-application meeting on a two-phase project with a historic-overlay ADU above a garage and related site changes.

    March 3, 2026 · 31 pages · 10.9 MB · PDS-Other Small Docs

    Download Neighborhood meeting notice and project summary

Application

  • Application for a garage with an upstairs accessory dwelling unit in the R-1C zone, filed by Pivot North Design for the property owner.

    Nov. 25, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Other documents

  • PDS-Concept Review Summary Report -

    Dec. 10, 2025 · 462 KB · PDS-Concept Review Summary Report

  • PDS-Other Small Docs - DESCRIPTION_12/03/2025

    Dec. 3, 2025 · 162 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - DESCRIPTION_12/03/2025

    Dec. 3, 2025 · 162 KB · PDS-Other Small Docs

Nearby

Historic preservation · Planning application

Historic district review approved

ApprovedFiled Nov. 5, 2025DRH25-00387North End · 1832 N 19th St820 ft away+1 related filing

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.