Planning project · Planning application
300,000-square-foot industrial warehouse proposed on 19 acres
The plan would build a warehouse for industrial uses, with site options for one building or two. It is under city review and goes before the Design Review Commission, which is the body that decides it.

About this application
Industrial warehouse building with phasing options that would total approximately 300,000 square feet space for industrial uses. *Project Management* - Joe Bruce
Project name on file: 2649 E FREIGHT ST
Timeline
Sept. 15, 2026
Pending Application Submittal: Planning Applications in Review
Aug. 27, 2026
IDR Review Complete: IDR Complete
Aug. 12, 2026
Neighborhood Meeting Review: Completed
July 24, 2026
Concept Review Complete: Notes
Reset to CR Per S. Mortensen
July 24, 2026
Concept Review Complete: Generate AWS
July 24, 2026
Concept Review Complete: CR Complete - Type 3
March 11, 2026
Concept Review Complete: Generate AWS
March 11, 2026
Concept Review Complete: CR Complete - Type 3
Feb. 11, 2026
Application Submittal: Online
Feb. 11, 2026
Application filed
Documents
Site plans
- Download Updated design review site plan options, sheets SD01-A and SD01-B
Two alternative site plan layouts dated March 10, 2026 showing phase footprints, setbacks, parking counts, fire lanes and a lot-line no-build option.
March 10, 2026 · 4 pages · 2.0 MB · PDS-Other Small Docs
- Download Single building site plan, option A
Design review site plan for a zero lot line warehouse layout, showing phase areas, zoning setbacks, parking counts, bike parking and a fire lane.
Feb. 11, 2026 · 1 page · 566 KB · PDS-Other Small Docs
- Download Two-building site plan, option B
Design review site plan sheet SD01-B showing phased warehouse and flex buildings, fire lanes, a no-build easement and a potential right-in right-out location to verify with ACHD.
Feb. 11, 2026 · 1 page · 574 KB · PDS-Other Small Docs
- Download Two-building site plan, option C
Design review site plan sheet SD01-C showing two warehouse phases with building areas, fire lanes, a gas line easement, lot line setbacks and a possible right-in right-out location to verify with ACHD.
Feb. 11, 2026 · 1 page · 556 KB · PDS-Other Small Docs
Renderings
- Download PDS-Other Small Docs - SINGLE BUILDING RENDERING
Feb. 11, 2026 · 1 page · 2.2 MB · PDS-Other Small Docs
Other documents
- PDS-Interdepartmental Review Summary Report - 8/27/2026
Sept. 4, 2026 · 508 KB · PDS-Interdepartmental Review Summary Report
- PDS-Other Small Docs - IDR PLANS_8/27/2026
Aug. 13, 2026 · 5.6 MB · PDS-Other Small Docs
- PDS-Other Small Docs - NM DOCUMENTS_8/11/2026
Aug. 12, 2026 · 7.2 MB · PDS-Other Small Docs
- PDS-Concept Review Summary Report -
March 11, 2026 · 476 KB · PDS-Concept Review Summary Report
- PDS-Application
Feb. 11, 2026 · 158 KB · PDS-Application
- PDS-Other Small Docs - PROJECT NARRATIVE
Feb. 11, 2026 · 100 KB · PDS-Other Small Docs
- PDS-Other Small Docs - SINGLE BUILDING ELEVATIONS
Feb. 11, 2026 · 493 KB · PDS-Other Small Docs
- PDS-Other Small Docs - SINGLE BUILDING FLOORPLAN
Feb. 11, 2026 · 166 KB · PDS-Other Small Docs