Replacement of two aging bridges over Boise River and canal under review

The plan would replace 1954 bridges over the Boise River and Ridenbaugh Canal, citing timber pile deterioration. It adds a left turn lane at the Barber Park access and a 16-foot pathway. The Planning & Zoning Commission is the review body.

In reviewPLN26-00231Filed March 6, 2026Barber Valley · 4010 S Eckert Rd+2 related filings
Site plan for Replacement of two aging bridges over Boise River and canal under review
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Eckert Bridge replacement

Project name on file: 4010 S ECKERT RD CFH(2)

Timeline

  1. March 23, 2026

    Pending Application Submittal: Planning Applications in Review

  2. March 16, 2026

    IDR Review Complete: IDR Waived

  3. March 16, 2026

    Concept Review Complete: CR Complete - Type 3 NBR Waived

  4. March 6, 2026

    Application Submittal: Online

  5. March 6, 2026

    Application filed

Documents

Site plans

  • Scaled site plan sheet with a revision table and drawing-check block, showing lot references and a proposed conditions label; the text is garbled and mostly unreadable.

    March 6, 2026 · 1 page · 1.2 MB · PDS-Other Small Docs

    Download Site plan (sheet 2 of 2, proposed conditions)

Project narrative

  • March 16, 2026 · 2 pages · 463 KB · PDS-Concept Review Summary Report

    Download PDS-Concept Review Summary Report -
  • Narrative explaining why two aging 1954 bridges need replacement, including safety and serviceability concerns, and describing the proposed roadway and pathway alignments.

    March 6, 2026 · 3 pages · 260 KB · PDS-Other Small Docs

    Download Project description and purpose and need

Notices

Application

Nearby

Foothills/hillside · Planning application

Foothills/hillside

ApprovedFiled Feb. 18, 2025CFH25-00014Southeast Boise · 3960 S Eckert Rd520 ft away+2 related filings

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.