Planning project · Planning application

Detached garage with apartment above and new retaining wall proposed at single-family home

The plan adds one accessory dwelling unit atop a new detached garage on a 0.28-acre lot and replaces a retaining wall. It revives a project whose earlier approvals expired, and it needs hillside review and a Hearing Examiner decision.

SubmittedPLN26-00726Filed July 30, 2026214 W Circle Way Dr+5 related filings
Site plan for Detached garage with apartment above and new retaining wall proposed at single-family home
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Garage w/ADU and replace retaining wall

Project name on file: 214 W CIRCLE WAY DR

Timeline

  1. Two days ago

    11 documents added

  2. Sept. 4, 2026

    IDR Review Complete: IDR Waived

  3. Sept. 4, 2026

    Neighborhood Meeting Review: Completed

  4. Aug. 18, 2026

    Concept Review Complete: CR Complete - Type 3

  5. Aug. 14, 2026

    Concept Review Complete: Engineering Preview Complete

    Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents (please submit them with subsequent applications), additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall system that is greater than four feet in height from top of foundation to top of wall, that has more than one wall when the interior horizontal distance between the walls is less than 10 feet and the total height of all walls exceeds four feet, that has a surcharge, that has a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Please refer to the Hillside Development Requirements for Technical Reports for grading & drainage plan and geotechnical report requirements.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted to and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org. Please include your application number and address in the subject line.

  6. Aug. 13, 2026

    Concept Review Complete: Engineering Preview

    This application was previously approved under PLN24-00618 and expired. Planning has decided to apply the previous conditions of approval to this new application. However, we would like to request a new Hillside Engineering Review.

  7. July 30, 2026

    Application Submittal: Online

  8. July 30, 2026

    Application filed

Documents

Site plans

Plans

Project narrative

Notices

Application

Correspondence