One-story, two-bedroom backyard cottage approved with conditions

The city approved an 891-square-foot accessory dwelling unit with a 142-square-foot covered porch beside a single-family home on Oct. 6. It also recognized the home's 1962 carport as a legal nonconforming structure. A lot consolidation survey must be recorded before building permits.

ApprovedCZC26-00237Filed Aug. 18, 2026South Boise Village · 1801 S Vermont Ave+2 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

The city approved a new one-story, two-bedroom accessory dwelling unit of 891 square feet, plus a 142 square foot covered porch, in the side yard of a single-family home at 1801 S Vermont Ave. The city also recognized the home's existing attached carport, built in 1962, as a legal nonconforming structure because it extends into the street-side and rear setbacks.

Parcel Consolidation, Legal Non- Conforming and new ADU

Project name on file: 1801 S VERMONT AVE

Timeline

  1. Oct. 6, 2026

    Review Complete: Completed

  2. Oct. 6, 2026

    Planning and Zoning: Complete

  3. Aug. 31, 2026

    Planning and Zoning: In Review

  4. Aug. 31, 2026

    Assign Reviewers: Completed

  5. Aug. 27, 2026

    Fee Payment: Payment Received

  6. Aug. 19, 2026

    Prescreen Review: Passed

  7. Aug. 19, 2026

    Prescreen Review: In Progress

  8. Aug. 18, 2026

    Application Submittal: ePlanReview

    Updated missing field to generate ePlan case.

  9. Aug. 18, 2026

    Application filed

Documents

Decisions

Other documents

  • PDS-Agency Comments - ACHD COMMENTS 9.18.2026

    Oct. 6, 2026 · 162 KB · PDS-Agency Comments

  • PDS-Agency Comments - BOISE PARKS DEPT COMMENTS 9.11.2026

    Oct. 6, 2026 · 59 KB · PDS-Agency Comments

  • PDS-Agency Comments - PW DRAINAGE COMMENTS 9.15.2026

    Oct. 6, 2026 · 134 KB · PDS-Agency Comments

  • PDS-Agency Comments - PW SEWER COMMENTS 9.8.2026

    Oct. 6, 2026 · 65 KB · PDS-Agency Comments

  • PDS-Agency Comments - VEOLIA WATER COMMENTS 9.8.2026

    Oct. 6, 2026 · 441 KB · PDS-Agency Comments

  • PDS-Letter of Intent - REVISED LETTER OF EXPLANATION 10.1.2026

    Oct. 6, 2026 · 73 KB · PDS-Letter of Intent

  • PDS-Legal Notice - ADMIN NOTICE

    Oct. 2, 2026 · 785 KB · PDS-Legal Notice

  • PDS-Maps and Drawings - NOTICING RADIUS MAP

    Oct. 2, 2026 · 514 KB · PDS-Maps and Drawings

  • PDS-Letter of Intent - LETTER OF EXPLANATION 8.27.2026

    Sept. 1, 2026 · 128 KB · PDS-Letter of Intent

  • PDS-Maps and Drawings - ELEVATIONS AND FLOOR PLAN 8.27.2026

    Sept. 1, 2026 · 220 KB · PDS-Maps and Drawings

  • PDS-Maps and Drawings - SITE AND LANDSCAPE PLANS 8.27.2026

    Sept. 1, 2026 · 1.0 MB · PDS-Maps and Drawings

  • PDS-Other Small Docs - BUILDING PERMITS & HISTORIC IMAGERY FOR LNC 8.27.2026

    Sept. 1, 2026 · 636 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - FIRE FLOW LETTER 8.27.2026

    Sept. 1, 2026 · 113 KB · PDS-Other Small Docs

  • PDS-Photos - SITE PHOTOS 8.27.2026

    Sept. 1, 2026 · 30.0 MB · PDS-Photos

  • PDS-Statement of Legal Interest - STATEMENT OF LEGAL INTEREST 8.27.2026

    Sept. 1, 2026 · 190 KB · PDS-Statement of Legal Interest

  • PDS-Receipts -

    Aug. 27, 2026 · 131 KB · PDS-Receipts

  • PDS-Application

    Aug. 19, 2026 · 202 KB · PDS-Application

Nearby

Planning project · Planning application

Duplex approved on small lot

ApprovedDecided Sept. 4, 2026PLN26-00347South Boise Village · 1732 S Euclid Ave840 ft away

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.