The proposal would merge an existing home's roughly quarter-acre lot with a portion of right-of-way that was recently vacated. No new homes or parking changes are proposed. City staff are reviewing the request administratively.

In reviewPLN25-00561Filed July 8, 2025Southeast Boise · 2415 S Scarlet St+1 related filing
Site plan for Request to combine lot with vacated right-of-way strip under review
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Parcel consolidation

Project name on file: 2415 S SCARLET ST

Timeline

  1. Sept. 2, 2026

    Pending Application Submittal: Planning Applications in Review

  2. Aug. 28, 2026

    Concept Review Complete: Engineering Preview

    Parcel Consolidation only - no new development proposed.

  3. Aug. 28, 2026

    Concept Review Complete: Engineering Preview Complete

    The consolidation raises no concern with PW Hillside; however, any site improvements will be a Cat II at a minimum. If the site improvements add density in will potentially escalate to a Cat III.

  4. Aug. 28, 2026

    Concept Review Complete: CR Complete - Type 2

  5. July 21, 2026

    Planning Applications: Notes

    Reopened per G. Flores

  6. July 21, 2026

    Planning Applications: Additional CR Needed

  7. July 10, 2026

    Project Cancellation: Expired

    PLN expired, applicant did not respond to email after 6 months of inactivity.

  8. March 12, 2026

    Concept Review Complete: Notes

    emailed applicant request for update

  9. Feb. 2, 2026

    Concept Review Complete: Notes

    emailed applicant to check in.

  10. Dec. 4, 2025

    Concept Review Complete: Notes

    Per applicant - wait to open the SUB until after the ACHD hearing in January.

  11. Nov. 4, 2025

    Concept Review Complete: Notes

    emailed requesting status on the project

  12. July 14, 2025

    Concept Review Complete: Engineering Preview Complete

    Correction:A determination has been made that this project will be a Category III Hillside project due to it being a subdivision within the Hillside Overlay.

  13. July 14, 2025

    Concept Review Complete: Corrections Required

    Please update the site plan to show the one parking spot required for the existing home. Must meet the 5' setback requirement. A standard parking pad is 9' x 20', and the back of the parking spot must meet the front setback of 20'.Please also provide a description of how the new lot is to be developed, or if it will just be sold off to be developed later.

  14. July 10, 2025

    Concept Review Complete: Engineering Preview

  15. July 10, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report; structural calculations for any retaining wall that is greater than four feet of height; more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height; a retaining wall having a surcharge; or having a backslope greater than three feet horizontal to one foot vertical; and civil plans.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  16. July 8, 2025

    Application Submittal: Online

  17. July 8, 2025

    Application filed

Documents

Site plans

  • Record of survey consolidating a portion of Lots 22 through 25 with vacated right-of-way, noting zoning, easements and that parcels may not be divided without City approval.

    July 21, 2026 · 1 page · 835 KB · PDS-Other Small Docs

    Download Record of survey for parcel consolidation
  • Site plan for a lot consolidation combining platted lots with an adjacent vacated right-of-way, including survey notes on easements, utilities and one offsite parking space.

    July 21, 2026 · 1 page · 1.4 MB · PDS-Other Small Docs

    Download Consolidation site plan with survey notes
  • Topographic survey with notes on proposed improvements, including removal of the existing garage, relocated parking, and resolution of a clouded title area and right-of-way vacation.

    July 8, 2025 · 1 page · 1.2 MB · PDS-Other Small Docs

    Download Existing topography and site plan of subdivision

Project narrative

  • Planner's advisory summary of a Type 2 concept review for consolidating parcels with a recently vacated right-of-way, requiring a Record of Survey and ACHD right-of-way vacation.

    Aug. 28, 2026 · 1 page · 447 KB · PDS-Concept Review Summary Report

    Download Concept review summary for parcel consolidation
  • Cover letter from a surveyor stating the owner wants to consolidate the parcel with adjacent vacated right-of-way, with the existing house and garage remaining.

    Aug. 24, 2026 · 1 page · 232 KB · PDS-Other Small Docs

    Download Project description for lot consolidation
  • Applicant letter explaining the plan to split the parcel into two platted lots, retain the 1955 house, remove the detached garage, and address a resolved title issue.

    July 8, 2025 · 1 page · 153 KB · PDS-Other Small Docs

    Download Project description narrative for two-lot subdivision
  • Record of survey retracing the exterior boundary of Tridoc Inc.'s property, showing details currently being resolved, with a narrative of the survey's purpose.

    July 8, 2025 · 2 pages · 3.6 MB · PDS-Other Small Docs

    Download Existing record of survey for the property

Application

  • Application form proposing to split the parcel to create a second buildable lot, keep the existing house on its own lot, and remove an existing garage.

    July 8, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire answering whether the project involves new parcel boundaries, a new dwelling, a new access driveway, and retaining walls; case number unassigned.

    July 8, 2025 · 1 page · 695 KB · PDS-Other Small Docs

    Download Hillside project questionnaire

Other documents

  • Legal description of consolidated property

    July 21, 2026 · 308 KB · PDS-Other Small Docs