Planning project · Planning application
Costco parking lot repaving, with some night work, approved
The city approved plans to remove and replace the aging asphalt at the Costco warehouse lot and restripe it. The request includes overnight work in select areas so the store can stay open. The city approved it June 5.

About this application
Repave parking lot.
Project name on file: 2051 S COLE RD
Timeline
June 5, 2026
Planning Applications: Project Entitled
May 18, 2026
Pending Application Submittal: Planning Applications in Review
March 25, 2026
Concept Review Complete: CR Complete - Type 2
March 9, 2026
Concept Review Complete: Corrections Required
Please discuss the timing of this project with the relocation of the fuel pump project with the Costco representative.
March 3, 2026
Application Submittal: Online
March 3, 2026
Application filed
Documents
Site plans
- Download Recommended pavement repair plan, figure 4A
Site plan showing pavement repair areas for light duty and heavy duty asphalt sections, subgrade stabilization zones, and concrete areas to remain, referencing a geotechnical report.
March 3, 2026 · 2 pages · 2.3 MB · PDS-Other Small Docs
Project narrative
- Download Parking lot reconstruction project description letter
Costco's letter describes a parking lot repaving and restriping project and requests approval for night construction in select operational areas.
March 3, 2026 · 2 pages · 186 KB · PDS-Other Small Docs
Application
- Download PDS-Application
March 3, 2026 · 2 pages · 159 KB · PDS-Application
Other documents
- PDS-Concept Review Summary Report -
March 25, 2026 · 460 KB · PDS-Concept Review Summary Report
- PDS-Other Small Docs - ENGINEER EVALUATION
March 3, 2026 · 14.9 MB · PDS-Other Small Docs