Skip to content

Planning project · Planning application

Pool and in-ground spa approved for foothills home on 0.62-acre lot

City staff approved the pool and in-ground hot tub on Oct. 13. The site is in the Hillside overlay, so the owner must provide a geotechnical report, pool engineering and a construction-time subgrade inspection.

ApprovedPLN26-00324Filed April 7, 2026Highlands · 950 W Parkhill Dr+1 related filing
Site plan for Pool and in-ground spa approved for foothills home on 0.62-acre lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Pool and spa additions in the Hillside overlay.

Project name on file: 950 W PARKHILL DR

Timeline

  1. Yesterday

    Status changed from In review to Approved

    Reported as “Project Entitled”.

  2. Two days ago

    Approved

  3. July 6, 2026

    Planning Applications: Project Entitled

  4. April 15, 2026

    Planning Applications: Generate Additional Application

    Generate new CFH due to Primary Contact change requested by Ben Semple to have Todd Rowey complete the submittal & upload.

  5. April 15, 2026

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  6. April 14, 2026

    Planning Applications: Generate Additional Application

  7. April 14, 2026

    Pending Application Submittal: Planning Applications in Review

  8. April 14, 2026

    Concept Review Complete: CR Complete - Type 2

  9. April 8, 2026

    Concept Review Complete: Engineering Preview

  10. April 8, 2026

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, having a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); engineering for the pool; and within the civil plans a sanitary sewer cleanout that can be used to drain the pool if the need ever arises.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  11. April 8, 2026

    Concept Review Complete: Corrections Required

    Hi Ben,Can you clarify for me which of the lines along the south portion of the Grading plan is the parcel line? And include the setback from the pool apron to the rear property line (an encroachment is allowed, but it still needs to show that it's at least 3' off the property line.)In addition, is the "spa" structure more similar to a hot tub or a small sauna building? Is it above or below ground? Please include the measurements from the rear property line.Thank you.

  12. April 7, 2026

    Application Submittal: Online

  13. April 7, 2026

    Application filed

Documents

Plans

  • Premier Pools and Spas concept drawings for a backyard pool, spa, and fire features on a single-family lot, including site map, grading legend, and general site notes.

    April 10, 2026 · 18 pages · 3.6 MB · PDS-Other Small Docs

    Download Concept pool plan set
  • Revised grading plan giving the dimension from the rear property line to the pool and spa; the spa is an in-ground hot tub, and the pool plans are a separate set.

    April 10, 2026 · 1 page · 662 KB · PDS-Other Small Docs

    Download Revised grading plan showing pool and spa setback
  • Grading legend, general site notes and grading notes for a single-family residential pool and spa project, including retained features and DEQ dewatering requirements.

    April 7, 2026 · 1 page · 661 KB · PDS-Other Small Docs

    Download Site and grading plan

Project narrative

  • Advisory concept review summary for a pool and spa in the Hillside overlay, classed as Category II, with notes on required geotechnical, structural and engineering documents.

    April 14, 2026 · 2 pages · 464 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Application form for a pool and spa construction in the rear yard of an existing single-family home in an R-1B zone, with applicant and owner contact details.

    April 7, 2026 · 2 pages · 158 KB · PDS-Other Small Docs

    Download Planning project application form

Correspondence

  • Public Works guidance on when retaining walls in the hillside zone need a determination, slope stability analysis, and planning-code height and setback limits.

    April 8, 2026 · 5 pages · 804 KB · PDS-Agency Comments

    Download Hillside retaining wall permitting guidance

Other documents

  • Checklist answering whether the project involves new parcels, additions, dwellings, driveways, grading over 12 inches, or retaining walls, with grading marked as yes.

    April 7, 2026 · 1 page · 652 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire

Nearby

Foothills/hillside · Planning application

Foothills/hillside

ApprovedFiled Oct. 2, 2025CFH25-00083Highlands · 1366 W Parkhill Dr0.2 mi away+1 related filing

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.