Planning project · Planning application
Single-family home on 0.34-acre lot approved in Hillside overlay
City staff approved plans for one single-family home on a 0.34-acre lot subject to the city's Hillside overlay rules. The administrative decision was made April 10, 2026; the application was filed July 22, 2025.

About this application
Single-family home in Hillside overlay.
Project name on file: 4673 N ACCIPITER PL
Timeline
April 10, 2026
Planning Applications: Project Entitled
Aug. 14, 2025
Planning Applications: Generate Additional Application
Aug. 14, 2025
Pending Application Submittal: Planning Applications in Review
Aug. 5, 2025
Concept Review Complete: Engineering Preview Complete
A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report; structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.
Aug. 5, 2025
Concept Review Complete: CR Complete - Type 2
July 23, 2025
Concept Review Complete: Engineering Preview
July 22, 2025
Application Submittal: Online
July 22, 2025
Application filed
Documents
Site plans
- Download Site plan cover sheet
Cover sheet for a single-family residence site plan, listing project info, zoning, setbacks, utilities, WUI and general notes, and energy code tables.
July 22, 2025 · 1 page · 1.9 MB · PDS-Other Small Docs
Plans
- Download East and north building elevations
Architectural elevation drawings for the east and north sides of a building, with a keynote list of exterior materials including stucco, horizontal siding, wall panels, stone and a metal roof cap.
July 22, 2025 · 1 page · 533 KB · PDS-Other Small Docs
- Download Floor plan
Architectural floor plan sheet showing room layouts, dimensions and fixtures for the residence, with keyed grid references and sheet cross-references.
July 22, 2025 · 1 page · 628 KB · PDS-Other Small Docs
Other documents
- PDS-Other Small Docs - GEOTECH REPORT
Aug. 7, 2025 · 1.5 MB · PDS-Other Small Docs
- PDS-Concept Review Summary Report -
Aug. 5, 2025 · 451 KB · PDS-Concept Review Summary Report
- PDS-Other Small Docs - GRADING & DRAINAGE DETAILS
Aug. 4, 2025 · 653 KB · PDS-Other Small Docs
- PDS-Other Small Docs - GRADING & DRAINAGE PLAN
Aug. 4, 2025 · 1.3 MB · PDS-Other Small Docs
- PDS-Application
July 22, 2025 · 154 KB · PDS-Application
- PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE
July 22, 2025 · 700 KB · PDS-Other Small Docs
- PDS-Other Small Docs - WEST AND SOUTH ELEVATIONS
July 22, 2025 · 532 KB · PDS-Other Small Docs