Skip to content

Planning project · Planning application

Single-family home in hillside area approved on 0.3-acre lot

City staff approved plans for one single-family house on a 0.3-acre lot in the hillside overlay. The decision was made administratively on May 15, without a public hearing.

ApprovedPLN26-00187Filed Feb. 19, 2026Central Foothills · 4711 N Accipiter Pl+1 related filing
Site plan for Single-family home in hillside area approved on 0.3-acre lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

Single-family dwelling in the hillside overlay.

Project name on file: 4711 N ACCIPITER PL

Timeline

  1. May 15, 2026

    Planning Applications: Project Entitled

  2. March 17, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Feb. 23, 2026

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with specific comments on the observed and reported issues in the area; and full civil plans.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  4. Feb. 23, 2026

    Concept Review Complete: CR Complete - Type 2

  5. Feb. 20, 2026

    Concept Review Complete: Engineering Preview

  6. Feb. 19, 2026

    Application Submittal: Online

  7. Feb. 19, 2026

    Application filed

Documents

Site plans

Project narrative

Other documents

  • PDS-Concept Review Summary Report -

    Feb. 23, 2026 · 465 KB · PDS-Concept Review Summary Report

  • PDS-Application

    Feb. 19, 2026 · 158 KB · PDS-Application

  • PDS-Other Small Docs - HILLSIDE QUESTIONNAIRE

    Feb. 19, 2026 · 688 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in Boise, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.