Skip to content

Planning project · Planning application

Single-family home proposed on 0.82-acre hillside lot

The application asks the city to approve one single-family house in a hillside area. Staff are reviewing it administratively, and the file includes a grading plan, site plan and building elevations.

In reviewPLN26-00826Filed Sept. 2, 2026Central Foothills · 4759 N Accipiter Pl+4 related filings
Site plan for Single-family home proposed on 0.82-acre hillside lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

About this application

SFD in Hillside

Project name on file: 4759 N ACCIPITER PL

Timeline

  1. Two days ago

    13 documents added

  2. Sept. 29, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Sept. 29, 2026

    Concept Review Complete: CR Complete - Type 2

  4. Sept. 8, 2026

    Concept Review Complete: Engineering Preview Complete

    Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents (please submit them with subsequent applications), additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall system that is greater than four feet in height from top of foundation to top of wall, that has more than one wall when the interior horizontal distance between the walls is less than 10 feet and the total height of all walls exceeds four feet, that has a surcharge, that has a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Please refer to the Hillside Development Requirements for Technical Reports for grading & drainage plan and geotechnical report requirements.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted to and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.Slope setback requirements will need to be verified against the plat.Above ground swim spas (prefabricated) (or the similar prefabricated, self-contained, self-standing, plunge style “pools”) are approvable as they can be fully above ground and could meet the exemptions from building permits see below (still need electrical/trades as/if applicable) and would not be classified as a true “pool”. The swim spa cannot be built in, below grade, partially below grade, or supported through concrete/earth on the sides (decking/stairs would be okay as long as those would not be supporting the swim spa structure).If it does not meet the exemption criteria per the building code it would not be approvable as it would be considered as a pool. Please keep in mind, above ground swim spas/hot tubs do need to comply with planning setbacks. Per Boise City code:BCC 9-1B-8: IRC ONE-AND-TWO-FAMILY DWELLING BUILDING CODE AMENDMENT, SECTION R105.2, WORK EXEMPT FROM PERMIT: 7. -Prefabricated swimming pools that are not greater than four (4) feet (1219 mm) deep.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org. Please include your application number and address in the subject line.

  5. Sept. 4, 2026

    Concept Review Complete: Engineering Preview

  6. Sept. 2, 2026

    Application Submittal: Online

  7. Sept. 2, 2026

    Application filed

Documents

Site plans

  • Site plan sheet showing lot setback lines, line and curve bearing tables, and a stone lamp post and concrete driveway, issued March 10, 2026.

    Sept. 2, 2026 · 1 page · 566 KB · PDS-Other Small Docs

    Download Site plan with setback lines and curve data

Plans

  • Architectural elevation drawing showing front (southwest) and left side (northwest) elevations with dimensions, roof, and finish notes.

    Sept. 2, 2026 · 1 page · 434 KB · PDS-Other Small Docs

    Download Building elevations, sheet 1
  • Architectural building elevation drawings, including right side (southeast) and motor court (northeast) elevations, with dimensions, notes and sheet references, prepared by Trey Hoff Architecture.

    Sept. 2, 2026 · 1 page · 227 KB · PDS-Other Small Docs

    Download Building elevations, document 2
  • Grading plan sheet from Breckon Land Design, showing spot elevations, finish floor and storm drain inlet elevations, and utility call-before-you-dig notes.

    Sept. 2, 2026 · 4 pages · 4.8 MB · PDS-Other Small Docs

    Download Detailed grading plan

Other documents

  • PDS-Concept Review Summary Report -

    Sept. 29, 2026 · 462 KB · PDS-Concept Review Summary Report

  • PDS-Application

    Sept. 2, 2026 · 154 KB · PDS-Application

  • PDS-Other Small Docs - APPLICATION

    Sept. 2, 2026 · 1.1 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - DETAILED LETTER OF EXPLANATION

    Sept. 2, 2026 · 16 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - FIREFLOW

    Sept. 2, 2026 · 111 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - GEO TECH REPORT

    Sept. 2, 2026 · 3.2 MB · PDS-Other Small Docs

  • PDS-Other Small Docs - LEGAL INTEREST STATEMENT

    Sept. 2, 2026 · 96 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - PUBLIC WORKS QUESTIONNAIRE

    Sept. 2, 2026 · 246 KB · PDS-Other Small Docs

  • PDS-Other Small Docs - SITE PHOTOS REQUIRED

    Sept. 2, 2026 · 2.1 MB · PDS-Other Small Docs