Ten Mile Creek
Planning applications, hearings and decisions in Ten Mile Creek, Ada County, from Ada County's public record.
- filed in the past 30 days
- 2
- hearings in the next 14 days
- 0
- decided in the past 30 days
- 1
Contractor's yard and shop proposed to support existing gravel pit
0.81-mile underground natural gas pipeline approved with conditions
Every filing
1–20 of 32, newest first
Conditional use · Planning application
Contractor's yard and shop proposed to support existing gravel pit
The plan would store equipment and vehicles tied to an existing gravel pit. The Ada County Planning and Zoning Commission is scheduled to hold a public hearing on the conditional use and master site plan on Nov. 19.
Accessory use · Planning application
972-square-foot detached accessory dwelling proposed on owner-occupied rural lot
The application would add a detached secondary home with a 528-square-foot footprint and a 444-square-foot loft. The property uses a domestic well and private septic system. The county is reviewing the request.
Conditional use · Planning application
150-foot commercial cell tower proposed on 14.8-acre rural residential property
The application seeks a conditional use permit for a 150-foot commercial cell tower on rural residential land. The Ada County Planning and Zoning Commission is scheduled to hold a public hearing on Dec. 10.
Accessory use · Planning application
2,100-square-foot storage building proposed on 1-acre rural residential lot
The Ada County application seeks a detached accessory structure for personal storage on a 1.02-acre lot. It could not be used as a business, industrial space or dwelling. The request was filed Aug. 25 and is in review.
Subdivision · Planning application
Two-lot subdivision on 10 acres sought in final plat request
Ada County is reviewing a final plat that would divide a 10.12-acre rural residential property into two lots. The application was filed Aug. 6.
Conditional use · Planning application
Contractor's yard on 10.77 acres seeks permit renewal with no new buildings
The owner wants to keep storing trucks and equipment for an off-site gravel crushing business, with no gravel stored or crushed on site. The Planning and Zoning Commission heard the request Oct. 15; no decision is on file.
Conditional use · Planning application
Gravel pit restart on 40 acres approved with conditions
The Ada County Planning and Zoning Commission approved Quality Sand & Gravel's plan on Oct. 15 to mine and crush rock for about 20 years, with a 750-square-foot office. Mining hours are limited, and a dust control plan is required.
Accessory use · Planning application
832-square-foot personal-use structure approved close to existing building
Ada County staff approved an accessory use permit allowing the 832-square-foot freestanding structure to sit less than 6 feet from an existing 1,200-square-foot building. It is for personal use only, not as a residence or for commercial or industrial use. Approval came Aug. 24.
Conditional use · Planning application
Farm expansion with new barn building, pavilions and bakery approved with conditions
Ada County commissioners on the Planning and Zoning Commission approved the expansion on Aug. 13 for a 163.6-acre working farm and agritourism venue. Conditions bar event parking on the public road and fireworks, and require outdoor events to end by about 9:30 p.m.
Conditional use · Planning application
0.81-mile underground natural gas pipeline approved with conditions
Northwest Pipeline LLC's 10-inch line would connect to an existing pipeline, with a fenced tap site and small corrosion-protection posts above ground. The county commission approved it Sept. 10, requiring an Idaho Power crossing agreement and on-site drainage.
Variance · Planning application
Request to live in manufactured home while new house and ADU are built withdrawn
The applicant sought permission to temporarily occupy the existing manufactured home while a new main house and a detached accessory dwelling unit are built. The request was filed June 26 and has been withdrawn.
Variance · Planning application
Ada County commissioners deny 1,455-square-foot, four-bedroom second home on 5 acres
The owners sought after-the-fact approval for an unpermitted second home built in the 1980s as an agricultural building. It exceeds size, bedroom and side-setback limits. Commissioners denied the request July 28 after staff recommended denial.
Accessory use · Planning application
1,800-square-foot garage for personal storage approved
Ada County Development Services approved a staff-level accessory use permit on June 18 for an 1,800-square-foot accessory structure to be used as a garage for personal storage on residential land.
Rezone · Planning application
ApprovedAda County approves rezoning and split of 9.36 acres into two lots
County commissioners approved the rezone, a two-lot split and a variance for the smaller 4.35-acre lot on Oct. 14. The plan adds one home site. Conditions require well studies, water testing and septic approval.
Rezone · Planning application
Ada County approves rezoning and split of 12-acre property into two lots
Commissioners approved the rezone with a development agreement on July 15. The land can be divided once into parcels of about 7.28 and 5.07 acres. No new buildings are proposed; two homes and several outbuildings already stand there.
Accessory use · Planning application
4,776-square-foot shop with attached accessory dwelling unit approved
Ada County Development Services approved the structure on April 29. It includes a 2,400-square-foot shop, a 1,200-square-foot accessory dwelling, a 744-square-foot garage and a 432-square-foot lean-to. Commercial or industrial use needs separate approval.
Parcel consolidation · Planning application
Two lots merged to allow future accessory structure
Ada County staff approved a request to combine lots 5 and 6 in Calderon Estates Subdivision, a non-farm subdivision, on April 7. The combination would allow a detached accessory structure to be built later.
Conditional use (time extension) · Planning application
Conditional use (time extension)
Board Time Extension for a Conditional Use and Master Site Plan, for an Amusement or Recreational Facility, Outdoor and Contractors Yard.
Accessory use · Planning application
Owner withdraws plan to convert 1,200-square-foot home into accessory unit
The application sought to turn an existing single-family home of about 1,200 square feet into an accessory dwelling unit while a new primary home of more than 2,000 square feet is built on the owner-occupied property. Ada County Development Services shows the application as withdrawn.
Conditional use (time extension) · Planning application
Conditional use (time extension)
Board level time extension for an approved Conditional Use for a commercial stable and riding arena.