Changes to shooting range with new backstop berm and two shelters approved
1,036-square-foot attached secondary dwelling sought with new 3,842-square-foot house
Every filing
1–9 of 9, newest first
Private road (time extension) · Planning application
Time extension sought for private road to Blacks Creek Energy Center
The request would extend the approval for a private road that would give access to the Blacks Creek Energy Center. The original approval is set to expire Sept. 30, 2026, and the extension request is under review.
Accessory use · Planning application
1,036-square-foot attached secondary dwelling sought with new 3,842-square-foot house
The application, filed Sept. 7, would add the secondary dwelling to a new primary home on land currently used as a farm. The county has received it but has not yet deemed it complete.
Conditional use (modification) · Planning application
Changes to shooting range with new backstop berm and two shelters approved
County staff approved a modification to a 60-acre range that reconfigures the east range with a new berm backstop for two 25-yard ranges and a 50-yard range. It also allows two covered shelters, grading of the main range and two double vault toilets. Approval came Sept. 17.
Conditional use · Planning application
Conditional use permit approved
An application for the approval of a Conditional Use and Master Site Plan for an Idaho Power Electrical Distribution Substation.
Master site plan (modification) · Planning application
Approved: 20,000-gallon fuel tank relocated to gravel pit, with new 20-foot light pole
Ada County staff approved a modification to a site plan that moves a double-walled 20,000-gallon fuel tank and its vaults to the south gravel pit and adds a roughly 20-foot lighting pole for the fuel station. The decision was made April 7 by county development staff.
Master site plan (modification) · Planning application
Approved: solar facility can be built before battery storage on 4,323 acres
Ada County staff approved a one-year extension of conditions for the site and let construction of the solar facility start before the battery storage facility. The decision was made Dec. 5.
Master site plan (time extension) · Planning application
Approved water storage tank extension with 6.78 million gallon capacity
Ada County staff approved a time extension for a planned 6.78 million gallon water storage tank, a 420-square-foot control building and related pipelines and an overflow pond. The tank would connect to an existing Veolia transmission line to meet projected 50-year water demand.
Conditional use · Planning application
Conditional use permit approved
Conditional Use and Master Site Plan for a Centralized Power Facility (Solar Farm), Electric Transmission Line, Battery Energy Storage System and Substation. Also included is a Variance to maximum site coverage.
Private road · Planning application
Private road approved to serve energy center
The approved private road extends access to an energy center project already cleared for construction. Ada County Development Services staff made the decision on Sept. 30.