Master site plan (time extension) · Planning application

Approved water storage tank extension with 6.78 million gallon capacity

Ada County staff approved a time extension for a planned 6.78 million gallon water storage tank, a 420-square-foot control building and related pipelines and an overflow pond. The tank would connect to an existing Veolia transmission line to meet projected 50-year water demand.

Approved202301358-BFiled Aug. 25, 2025Blacks Creek · S Eisenman Rd+1 related filing
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in Ada County's record. See the official record

Administrative Time Extension for proposed improvements include a new 6.78 million gallon storage tank, 24 inch inlet/outlet transmission lines, 15 inch diameter overflow line, approximately 420 square foot control building, and a 1,000,000 gallon overflow pond. The tank will increase water storage/delivery capabilities, based on the 50-year projected population. The project will connect to Veolia’s existing transmission line.

Timeline

  1. Oct. 1, 2025

    Approved

    Approved by Ada County Development Services staff.

  2. Aug. 25, 2025

    Application filed

Documents

No documents have been published for this record yet.

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.