Master site plan (time extension) · Planning application
Approved water storage tank extension with 6.78 million gallon capacity
Ada County staff approved a time extension for a planned 6.78 million gallon water storage tank, a 420-square-foot control building and related pipelines and an overflow pond. The tank would connect to an existing Veolia transmission line to meet projected 50-year water demand.
From the filing
The application's description as it appears in Ada County's record. See the official record
Administrative Time Extension for proposed improvements include a new 6.78 million gallon storage tank, 24 inch inlet/outlet transmission lines, 15 inch diameter overflow line, approximately 420 square foot control building, and a 1,000,000 gallon overflow pond. The tank will increase water storage/delivery capabilities, based on the 50-year projected population. The project will connect to Veolia’s existing transmission line.
Timeline
Oct. 1, 2025
Approved
Approved by Ada County Development Services staff.
Aug. 25, 2025
Application filed
Documents