Planning project · Planning application
80-foot wireless tower approved on industrial land, taller than zone allows
The Planning and Zoning Commission approved a conditional use permit for an 80-foot monopole wireless facility on a site of about 5 acres. The zone's height limit is 55 feet. A minor design review follows approval.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Wireless Communication Facility exceeding the height of the zone
Project name on file: 1200 N CURTIS RD
Timeline
Oct. 13, 2026
6 documents added
Sept. 8, 2025
Planning Applications: Project Entitled
July 30, 2025
Pending Application Submittal: Planning Applications in Review
June 10, 2025
IDR Review Complete: IDR Waived
June 10, 2025
Neighborhood Meeting Review: Completed
May 12, 2025
Concept Review Complete: CR Complete - Type 3
April 29, 2025
Concept Review Complete: Corrections Required
Please upload a project description stating whether there will be a change in the footprint of the equipment compound, or an addition to the height of the monopole. Please also include the details of how many antenna are being replaced.
April 25, 2025
Application Submittal: Online
April 25, 2025
Application filed
Documents
Site plans
- Download Updated zoning site plan, project moved out of water easement
Revised zoning site plan for a Maverick Towers wireless facility, relocating the project out of a water easement; includes general project notes and revision history.
May 27, 2025 · 5 pages · 1.2 MB · PDS-Other Small Docs
Plans
- Download Telecom tower general project notes and site information sheet
Sheet set for a Maverick Towers wireless facility, including general construction notes, site information, and a revision block dated 04/21/25 marked issued for review.
April 29, 2025 · 4 pages · 980 KB · PDS-Other Small Docs
Project narrative
- Download Concept review summary report
Planning concept review notes for a proposed 80-foot wireless facility monopole in the I-1 zone, listing required conditional use permit, design review, and wireless siting requirements.
May 12, 2025 · 3 pages · 453 KB · PDS-Concept Review Summary Report
Notices
- Download Neighborhood meeting invitation letter and mailing list
Invitation letter for a June 9, 2025 neighborhood meeting on a proposed 80-foot wireless telecommunications monopole, with a 500-foot radius mailing list.
June 9, 2025 · 16 pages · 3.1 MB · PDS-Other Small Docs
Application
- Download Planning project application form
Application for an 80-foot monopole with fenced equipment area in an I-1 zone, filed by Maverick Towers for owner CCWO2 LLC.
April 25, 2025 · 2 pages · 154 KB · PDS-Application
Correspondence
- Download Email correspondence regarding wireless telecommunications facility
April 25, 2025 · 1.3 MB · PDS-Other Small Docs