Skip to content

Planning project · Planning application

Detached 585-square-foot accessory dwelling with garage proposed on 0.77-acre lot

The one-bedroom, one-bathroom unit would sit on a lot in a flood zone and wetland area. The application is under administrative review, and city planners say it must also meet floodplain and river setback rules.

SubmittedPLN26-00437Filed May 6, 2026Southeast Boise · 2190 E Gossamer Ln+2 related filings
Site plan for Detached 585-square-foot accessory dwelling with garage proposed on 0.77-acre lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Detached ADU with garage.

Project name on file: 2190 E GOSSAMER LN - ADU

Timeline

  1. June 17, 2026

    Planning Applications: Generate Additional Application

  2. June 17, 2026

    Pending Application Submittal: Planning Applications in Review

  3. May 27, 2026

    Concept Review Complete: CR Complete - Type 2

  4. May 6, 2026

    Application Submittal: Online

  5. May 6, 2026

    Application filed

Documents

Site plans

Project narrative

  • Advisory concept review notes for a proposed 585 sq ft one-bedroom ADU, covering required floodplain and ADU zoning applications, Boise River and wetland setbacks, and placement in front of the primary building.

    May 27, 2026 · 2 pages · 468 KB · PDS-Concept Review Summary Report

    Download Concept review summary for accessory dwelling unit
  • Narrative from the applicant describing a proposed 600 SF detached garage with an 600 SF accessory dwelling unit above, R-2 setbacks, and questions about conditional approval and the Boise River System Overlay.

    May 6, 2026 · 1 page · 64 KB · PDS-Other Small Docs

    Download Project description for detached garage with ADU

Application

  • Application for a detached garage with an accessory dwelling unit above it in an R-2 zone, with applicant and owner contact details and a signed certification.

    May 6, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.